Skip to Content

Browse

Certifications CE(2) Lead time 70 days

600-2400mm HDPE Single-screw Controlled Automatic Hollow Spiral Winding Pipe Extrusion Line

MOQ: 1 Units
442,080.00
Certifications 2006/42/EC Lead time 60 days

PE/HDPE Pipe Making Machine Single-screw Extrusion Line with PLC Control Motor & Bearing High Capacity

MOQ: 1 Units
44,870.00
Certifications CE(2) Lead time 90 days

ID32mm-OD110mm Plastic Corrugated Pipe Extrusion Line 90mm HDPE DWC Pipe High Speed Molding Machine

MOQ: 1 Units
74,380.00
Certifications CE ISO Lead time 90 days

HDPE Water Supply Pipe/Gas Pipe Tube Hole Energy-Saving and High Speed Extrusion Line Machine

MOQ: 1 Units
57,220.00
Lead time 30 days

HDPE PP PVC Horizontal Type Double Wall Corrugated Pipe Extrusion Line

MOQ: 1 Units
336,070.00
Certifications CE(2) Lead time 90 days

HDPE Water/Gas Supply Pipe Energy-saving and High Speed Extrusion Line

MOQ: 1 Units
293,170.00