Skip to Content

Browse

Electric Drill Rig Coal Mine Rig Full Hydraulic Drilling Rig for Coal Mine Tunnel

Available for enquiry 0.0 · 0 reviews
USD

6,230.00 6230.0 USD 6,230.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Usage
Ore
Type
Rotary Drilling Rig
Drilling Depth
Max.100m
Drilling Diameter
450 mm
Power Type
Electric
Voltage
380 V, 660 V
Product description

Crawler drilling rig

This lightweight crawler drill rig is a new type high efficiency and energy saving drilling equipment designed by

Technical Parameter

ModelGD1500
Drilling rig typeSmall Rotary drilling rig,Adding impactor it will change to Rock drilling rig.
Driling diameter50-200mm
Drilling depth20-50m
Drilling rod rotating speed0-140r/min
Vertical shaft torque580N
Rated pressure of oil pump21.5Mpa
Tilt range of vertical shaft35-90°
Electric motor15kw
Diesel engine brandWeichai CY32EM
Diesel engine23.5HP
Overall dimension2200*1150*1900mm
Weight950kg

Performance Features

This drilling rig use hydraulic cylinder propulsion, changing the traditional cylinder and electric winch propulsion and lifting, better efficiency, high performance and stability! The power requirements of the air compressor are lower, the drilling efficiency is higher, and the drilling aperture and hole depth can be effectively played to the limit. It has the advantages of small size, easy operation, simple disassembly, simple maintenance, convenient transportation, and operation drilling construction.

The drilling rig matches the air compressor according to the hole depth and aperture, and the power of the air compressor directly affects the depth and aperture of the drilling hole. For the bedrock, wind fossil, strong weathering must match the impactor to better use, can also use a twist drill pipe drill in soil drilling construction, can also add water for drilling.

Factory Display

Precautions in the use of drilling rig. 1, the crawler diesel engine first clutch state, hang into neutral, add a small throttle; Then the direct ignition starts, the use of high-speed driving is prohibited for safety during the walking process. 2. Check the screw oil and butter before use. 3, when the drill is connected to the electric work, the electric pump station must check the positive and negative rotation of the motor, the oil pump motor is not provided with oil, the control valve is not responsive, and there will be problems such as oil pump, holding and burning the motor. The machine is constructed under the condition of relatively large dust during the work period, and attention is paid to cleaning the diesel engine air filter for 4-8 hours, so as not to cause problems such as diesel engine damage, cylinder pulling, and oil burning. 4. The whole system can be used with twist drill pipe, impactor and air compressor 5, easy to move, simple operation, fast transportation, van, pickup truck, pull away at will. 6, in the process of use, construction workers must be safe and correct operation of the machine, pay attention to the safety of electrical protection, labor protection gloves correctly wear safety helmets, so as not to hurt themselves and others! Lightweight crawler drilling rig support to custom various types of drilling depth,drilling diameter, electric power and diesel power options!

Located in Zhengzhou City, is specialized in machinery over 20 years.

We stick to the principle of "quality first, service first, continuous improvement and innovation to meet the customers" for the management and "zero defect, zero complaints" as the quality objective. Our products are widely recognized and trusted by domestic and foreign Customers; And have been exported to more than 50 countries and regions in the world, including:,,,,,,,,, and other countries, and win the good reputation of the clients all over world with reliable service. You can be rest assured that All the products with high quality meet international standards and have won a good reputation at home and abroad.

FAQ

1. Q: What is the after-sales service? A: We could supply wear parts together with machine when delivery. The operation video and instruction file will send to you once you buy our machine.When using the machine, if you have some questions, our engineer also can guide you through the video to help you to solve the problem.

2. Q:How to make payment? A: L/C,Paypal, Western Union, Moneygram or T/T transfer.

A: L/C,Paypal, Western Union, Moneygram or T/T transfer.

3. Q: How does your factory do regarding quality control? A: Quality is priority. We always attach great importance to quality control from the very beginning to the end of the production. Every product will be fully assembled and carefully tested before it's packed for shipment.

A: Quality is priority. We always attach great importance to quality control from the very beginning to the end of the production. Every product will be fully assembled and carefully tested before it's packed for shipment.

4. Q: What is your warranty terms? A: We offer different warranty time for different products. Please contact with us for detailed warranty terms.

A: We offer different warranty time for different products. Please contact with us for detailed warranty terms.

Description images
Electric Drill Rig Coal Mine Rig Full Hydraulic Drilling Rig for Coal Mine Tunnel
Electric Drill Rig Coal Mine Rig Full Hydraulic Drilling Rig for Coal Mine Tunnel
Electric Drill Rig Coal Mine Rig Full Hydraulic Drilling Rig for Coal Mine Tunnel
Electric Drill Rig Coal Mine Rig Full Hydraulic Drilling Rig for Coal Mine Tunnel
Packaging and fulfilment
  • Step 1

    Payment and order readiness

    Minimum order: 1 Units

    Payment terms, specifications, and order details are confirmed before preparation begins.

  • Step 2

    Preparation

    15 days

  • Step 3

    Packaging and dispatch

    Packaging details are available on request.

    Final packing, freight, and delivery dates are confirmed before dispatch.

Technical specifications
Other details 29 fields
Usage
Ore
Type
Rotary Drilling Rig
Drilling Depth
Max.100m
Drilling Diameter
450 mm
Power Type
Electric
Voltage
380 V, 660 V
Core components
Engine
Warranty
1 Year
Machinery test report
Provided
Video outgoing-inspection
Provided
Key selling points
Low Maintenance Cost
Place of origin
China, Henan
Weight
950 KG
Dimension (L*W*H)
1250*640*1265mm
Mobility
YES
Feature
small, light and easy to move
Keyword
Drilliing Rig
After-sales Service Provided
yes
Function
anchor drilling for grouting project
Drilling method
Rotating Hydraulic
Application
Coal Mine, tunnel, subway, slope support grouting hole
Customized Service
Available
Motor power
15KW
Vertical shaft tilt adjustment range
35-90°
Selling Units
Single item
Single package size
130X70X130 cm
Single gross weight
950.0 kg
Model number
GD1500
Power (W) (Product option)
15kw
Lead time
15 days
Minimum order
1 Units

Customer reviews

0.0 (0)

No reviews yet

Be the first customer to review this product.

Write a review

Up to 5 JPG, PNG or WebP images; 5 MB each.

Request custom sourcing

Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

Best-match productsCompetitive quotesFast turnaround
Request custom sourcing

Upload your requirements

Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
XLSX
Files are sent securely.