| Product Name | oxygen blowing Steel Pipe |
| Standard | GB AISI ASTM DIN EN JIS |
| Thickness | 0.5mm-60mm |
| Length | 1m-12 m or as Requirement |
| Surface | Electro-galvanizing, hot-dip galvanizing, or black |
| Outer Diameter | 6mm-1200mm |
| Material | 20# /45#/ Q195/Q235/Q345/S235/S275/S355/SS400 etc |
| Shape | Round.Square.Rectangle. |
| Technique | Cold Rolled;Hot Rolled |
| Packing | Standard sea-worthy packing |
| Price Term | Ex-work, FOB, CFR, CIF, or as Requirement |
| Exports | African countries,,,, Viet,, etc. |
| Container Size | 20ft GP:5898mm(Length)x2352mm(Width)x2393mm(High),20-25 Metric ton 40ft GP:12032mm(Length)x2352mm(Width)x2393mm(High),20-26 Metric ton 40ft HC:12032mm(Lengh)x2352mm(Width)x2698mm(High),20-26 Metric ton |
| Payment terms | T/T, L/C, Western Union |
is a diversified enterprise integrating metal products and international trade.We have established a number of joint venture steel production lines with many well-known steel enterprises, with an annual output of 5 million tons.
1.What's your advantage? A: Honest business with competitive price and professional service on export process.
A: Honest business with competitive price and professional service on export process.
n you give warranty of your products? A: Yes, we extend a 100% satisfaction guarantee on all items. Please feel free to feedback immediately if you are not pleased with our quality or service.
A: Yes, we extend a 100% satisfaction guarantee on all items. Please feel free to feedback immediately if you are not pleased with our quality or service.
3.Where are you? Can I visit you? A: Sure,welcome to you visit
A: Sure,welcome to you visit
4.How about the delivery time? A: Within 7-15 days after we confirm you is based on the order quantity and requirement.
A: Within 7-15 days after we confirm you is based on the order quantity and requirement.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
Lead time will be confirmed with your quotation.
-
Step 3
Packaging and dispatch
Standard · Estimated delivery: Sep 8–Sep 27 (8–27 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.