Skip to Content

Browse

Boiler Flue Gas CO2 Recovery Unit Industrial Carbon Capture & Storage System High-Efficiency CCS Plant Liquid Co2

Available for enquiry 0.0 · 0 reviews
USD

35,900.00 35900.0 USD 35,900.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Capacity
5-3000Nm3/h, 300 ~ 15000Nm3/H
Voltage
440 V
Core components
Bearing, PLC, Motor, Pressure Vessel, Gear, Engine, Pump, Gearbox
Machinery test report
Provided
Warranty
1 Year
Video outgoing-inspection
Provided
Product description

Product details

High capture efficiency: Achieves CO2 recovery rate of ≥90% (up to 95% with advanced configuration), maximizing yield from boiler flue gas.

High product purity: Delivers CO2 purity from industrial grade (≥99.5%) to food grade (≥99.99%), compliant with ISBT standards.

Significant energy savings: Consumes up to 45% less energy compared to traditional CO2 production methods, reducing operating costs.

Fast payback period: Typical ROI achieved within 6/12 months (approximately 7 months based on field data), turning environmental investment into profit.

CBAM & carbon neutral ready: Helps buyers comply with EU CBAM regulations, reduce carbon footprint, and generate carbon credits under ISO 14064.

Flexible product grades: Outputs CO2 for multiple applications: EOR (enhanced oil recovery), beverage carbonation, dry ice, greenhouse fertilization, and chemical synthesis.

Proven MEA absorption technology: Uses stable chemical absorption process suitable for low-concentration flue gas (8 to 35% CO2), widely adopted in power plants and industrial boilers.

Automated & reliable operation: Equipped with DCS control system, enables 24/7 unattended operation, reduces labor cost and human error.

Modular & compact design: Small footprint (starting from 72 m2) and modular structure allow easy installation and scalability from 0.3 to 10 tons of liquid CO2 per hour.

Full after-sales support: Provides overseas on-site installation, customized engineering, operator training, and spare parts supply, engineers available to service machinery overseas.

Frequently asked questions

The system achieves a CO2 recovery rate of 90 percent or higher, with advanced configurations reaching up to 95 percent. This high efficiency maximizes the yield from flue gas containing only 8 to 35 percent CO2, making it economically viable even for low concentration sources like coal or gas fired boilers.

You can obtain industrial grade over 99.5 percent purity or food grade over 99.99 percent purity. Industrial grade is used for metal welding, dry ice production, and enhanced oil recovery (EOR). Food grade meets ISBT and EIGA standards for beverage carbonation, food preservation, and medical applications. The purity is adjustable based on downstream needs.

The electrical energy consumption ranges from 190 to 250 kWh per ton of CO2, depending on plant scale and configuration. Additionally, the system requires about 1.0 to 1.5 tons of low pressure steam per ton of CO2 for solvent regeneration. Compared to traditional combustion based CO2 production, this system saves up to 45 percent in overall energy costs.

Based on field data from operating plants, the payback period is typically 6 to 12 months. With carbon credit prices exceeding 105 RMB per ton and the growing demand for captured CO2 in beverage, dry ice, and EOR markets, many users recover their equipment investment in about 7 months. A customized ROI analysis can be provided based on your local energy and CO2 selling prices.

The required floor space ranges from 72 square meters for a 0.3 ton per hour unit up to 600 square meters for a 10 ton per hour plant. Thanks to the modular and skid mounted design, installation is quick. A standard system can be installed and commissioned within 4 to 6 weeks after site preparation is complete. Our engineering team provides on site supervision and training to ensure smooth startup.
Description images
Product detail
Product detail
Product detail
Product detail
Packaging and fulfilment
  • Step 1

    Payment and order readiness

    Minimum order: 1 Units

    Payment terms, specifications, and order details are confirmed before preparation begins.

  • Step 2

    Preparation

    60 days

  • Step 3

    Packaging and dispatch

    Packaging details are available on request.

    Final packing, freight, and delivery dates are confirmed before dispatch.

Technical specifications
Other details 23 fields
Capacity
5-3000Nm3/h, 300 ~ 15000Nm3/H
Voltage
440 V
Core components
Bearing, PLC, Motor, Pressure Vessel, Gear, Engine, Pump, Gearbox
Machinery test report
Provided
Warranty
1 Year
Video outgoing-inspection
Provided
Key selling points
Eco-Friendly
Production Rate
60 ~ 100%
Place of origin
China, Henan
Weight
9999 KG
Application
Chemical
Function
Cryogenic Making
Technology
Pressure Swing Adsorbtion (PSA)
Keyword
Carbon dioxide recycling
After-sales Service Provided
Engineers
Purity (Specification)
95-99.999%
Advantage
High Efficiency Low Cost
Usage
Gas Seperation
Selling Units
Single item
Single volume
0 cm3
Single gross weight
0.0 kg
Model number
CNCD-CO2-1
Power (W) (Product option)
0.3-0.34kw.h/Nm3(co2)
Lead time
60 days
Minimum order
1 Units

Customer reviews

0.0 (0)

No reviews yet

Be the first customer to review this product.

Write a review

Up to 5 JPG, PNG or WebP images; 5 MB each.

Request custom sourcing

Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

Best-match productsCompetitive quotesFast turnaround
Request custom sourcing

Upload your requirements

Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
XLSX
Files are sent securely.