Pidgeon Process Magnesium Metal Processing Plant
W e are a leading manufacturer of magnesium
We can provide plant design, equipment/spare parts supply, consultation and technical service for dolomite & magnesite calcination. - More than 50 years experience in magnesium industry. - Design capacity of magnesium line: 5,000-25,000 tons per year. - Professional Process Design Engineers, Equipment Engineers, Electrical Engineers. - Leading supplier of magnesium
Magnesium Calcination Process step1: Calcining
a. Process introduction: Selecting proper dolomite (size from 10-50mm),crushing and screening after it is carried to the factory, then feed the dolomite (>20mm) to the calcination system(including preheater,rotary kiln and cooler), after calcination and cooling, then the calcined dolomite will be conveyed to the hopper.
b. Main Equipments: Jaw Crusher, Conveyor, Vibrating screen, Vertical preheater, Rotary kiln, Vertical cooler, etc.
step2:Grinding and balling a.Process introduction: Using jaw crusher and ferrosilicon crusher to crush and grind ferrosilicon to the size of less than 20mm, then grinding these three kinds of minerals(calcined dolomite,ferrosilicon and fluorite), after grinding, convey them to the briquetter. b.Main equipment: Electronic batching scale, Bucket elevator, Ball mill, Screw conveyer,FU chain conveyor, etc.
step3:Reduction reaction and Refining a.Process introduction: To refine the raw materials, and produce qualified products. b.Main equipment: Reduction furnace, Refining furnace, Electronic moisture device, Wind machine, Vacuum pump, Electronic moisture device, Jet pump, Continuous casting machine, etc.
| Model (m) | Basic Parameters(t/h) | Qty of Support (No.) | Equipment Weight(t) | |||
| Reloving Speed (r/min) | Slope(%) | Capacity (t/h) | Power(KW) | |||
| φ1.6*32m | 0.58-2.85 | 4 | 2 | 18.5 | 3 | 46.8 |
| φ1.6/1.9*36m | 0.53-1.59 | 4 | 2.5-3 | 22 | 3 | 57 |
| φ1.9*39m | 0.53-1.59 | 4 | 3-3.4 | 37 | 3 | 71.79 |
| φ2.2*45m | 0.214-1.64 | 3.5 | 4-5 | 45 | 3 | 142.6 |
| 4 | ||||||
| φ2.5*50m | 0.62-1.5 | 3.5 | 5-6 | 55 | 3 | 180 |
| 7.5 | ||||||
| φ2.5*55m | 0.62-1.5 | 3.5 | 5-6 | 55 | 3 | 185 |
| 7.5 | ||||||
| φ2.8*55m | 0.62-1.5 | 3.5 | 6-7 | 75 | 3 | 215.6 |
| 11 | ||||||
| φ3.0*60m | 0.5-1.5 | 3.5 | 7-9 | 125 | 4 | 310.9 |
| 11 | ||||||
| φ3.2*64m | 0.4-1.5 | 3.5 | 8-10 | 190 | 4 | 337.8 |
| 22 | ||||||
| φ3.5*70m | 0.4-1.5 | 3.5 | 12-14 | 280 | 4 | 394.6 |
| 22 | ||||||
| φ4.0*80m | 0.4-1.5 | 3.5 | 16-20 | 355 | 4 | 564.8 |
| 30 |
Projected Cases
Certifications
We have got
ISO9001:2008 Quality Management System Certification
CE Certification (Ball Mill)
ISO14001:2004 Environmental Management System Certification
OHSAS 18001:2007 Occupational Health&safety Management System Certification
FAQ
To help us provide you the first-rate service, could please kindly answer the following questions before sending an inquiry?
1. Have you done project design for your plant, if not, would you prefer that we assist you to do it?
2. What is your expected production capacity?
3. What is your raw material?
4. Is your material self-possessed or outsourced?
5. What is the particle size of your raw material?
6. Have you done chemical analysis for your raw ore?
7. Which kind of fuel are you inclined to use, gas, coal or furnace oil?
We are dedicated to provide you the most suitable products with the most reasonable price and we sincerely welcome you to visit





-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.