Skip to Content

Browse

Certifications RoHS

Factory Custom Metal Alloy Steel Casting 350Z 370Z Turbo Manifold

Available for enquiry 0.0 · 0 reviews
USD

30.00 30.0 USD 30.00

Not Available For Sale

Minimum order quantity: 10 Units

Key attributes

View all
Purpose
for replace/repair
Condition
New
OE NO.
CUSTOMIZED
Warranty
customized
Place of origin
China, Shanghai
Size
Customized
Product description

OUR SLOGAN · Do Not Miss Any Detail!!!

Factory Custom Metal Alloy Steel Casting 350Z 370Z Turbo Manifold
General Products Application /Service AreaMetal Parts Solution for Vehicle, Agriculture machine, Construction Machine, transportation equipment, Valve and Pump system. E.g. Engine bracket, truck chassis bracket, gear box, gear housing, gear cover, shaft, spline shaft, pulley, flange, connection pipe, pipe, hydraulic valve, valve housing,Fitting, flange, wheel, flywheel, oil pump housing, starter housing, coolant pump housing, transmission shaft, transmission gear, sprocket, chains etc.
Main Blank Process - For Steel CastingInvestment casting (wax mold made by middle temperature wax); Lost Wax Casting (wax mold made by low temperature wax)
Blanks Casting ToleranceCT7-8 for Lost wax Casting Process CT4-6 for Investment casting Process
Applicable Materials for investment casting or lost wax castingCarbon steel, Low Carbon steel, middle carbon steel, G35, G45, WCB, WCA, WCC, ISO 340-550, etc. Alloy Carbon steel: G25CrMo4, Heat Resistant Steel, etc. Stainless Steel: SUS 304, 304L, 316, 316L, CF8, CF8M, G-X7CrNiNb1189, etc. OR According to customer requirement.
Casting Blank Size /Dimensions2 mm-600mm / 0.08inch-24inch according to customer requirement
Applicable Machining ProcessCNC Machining/ Lathing/ Milling/ Turning/ Boring/ Drilling/ Tapping/ Broaching /Reaming /Grinding/Honing and etc.
Machining ToleranceFrom 0.005mm-0.01mm-0.1mm
Machined Surface QualityRa 0.8-Ra3.2 according to customer requirement
Applicable Heat TreatmentNormalization, annealing, quenching and tempering, Case Hardening, Nitriding, Carbon Nitriding, Induction Quenching.
Applicable Surface TreatmentShot/sand blast, polishing, Surface passivation, Primer Painting, Powder coating, ED- Coating, Chromate Plating, zinc-plate, Dacromat coating, Finish Painting.
MOQ for mass productionFor turbo manifold: 10pcs or as client required
Lead TimeAbout 50 days from the receipt date of turbo manifold

inner packing

Strong & waterproof plastic big is packed inside, to keep the product in safe condition. Or as customer requests.

outer packing

Multilayer wooden box with strong bandages, used for standard export package. Or customized as per customer's requirements.

Customers have become our friends, also what we call family members. welcome to join us!

2. How can I get some samples?

If you need, we are glad to offer you samples for free, but the new clients are expected to pay the courier cost, and the charge will be deducted from the payment for formal order.

3. Can you make turbo manifold according to our drawing?

Yes, we can make turbo manifold according to your drawing, 2D drawing, or 3D cad model. If the 3D cad model can be supplied, the development of the tooling can be more efficient. But without 3D, based on 2D drawing we can still make the samples properly approved.

4. Can you make turbo manifold based on our samples?

Yes, we can make measurement based on your samples to make drawings for tooling making.

5. What's your quality control device in house?

We have spectrometer in house to monitor the chemical property, tensile test machine to control the mechanical property and UT Sonic as NDT checking method to control the casting detect under the surface of casting.

Certifications & compliance
RoHS
RoHS compliant
Description images
Product detail
Product detail
Product detail
Product detail
RoHS
Packaging and fulfilment
  • Step 1

    Payment and order readiness

    Minimum order: 10 Units

    Payment terms, specifications, and order details are confirmed before preparation begins.

  • Step 2

    Preparation

    45 days

  • Step 3

    Packaging and dispatch

    Packaging details are available on request.

    Final packing, freight, and delivery dates are confirmed before dispatch.

Technical specifications
Other details 21 fields
Purpose
for replace/repair
Condition
New
OE NO.
CUSTOMIZED
Warranty
customized
Place of origin
China, Shanghai
Size
Customized
Car Model
customized
Item
Factory Custom Metal Alloy Steel Casting 350Z 370Z Turbo Manifold
Material
WCB, WCA, WCC, ISO 340-550, etc. As customer request, ZG35, ZG45
Manufacturing Process
Option Lost Wax Casting, Lost wax casting
Casting Tolerance
CT4-8 for turbo manifold
Machining Process
CNC Machining/ Lathing/ Milling/ Turning/ Boring/ Drilling etc.
Machining Tolearnce
Up to IT7, Ra 0.8~3.2, according to customer requirement
Surface Treatment
Surface Passivatin, Polish. As customer requests.
Package
with big plastic bag inside, Multi-layer wooden box/pallet
Lead time
About 50 days for turbo manifold
Service
Supply custom casting service
Selling Units
Single item
Single package size
100X50X50 cm
Single gross weight
50.0 kg
Certifications & Compliance
RoHS
Lead time
45 days
Minimum order
10 Units

Customer reviews

0.0 (0)

No reviews yet

Be the first customer to review this product.

Write a review

Up to 5 JPG, PNG or WebP images; 5 MB each.

Request custom sourcing

Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

Best-match productsCompetitive quotesFast turnaround
Request custom sourcing

Upload your requirements

Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
XLSX
Files are sent securely.