Product details
OSuperior Wear Resistance - 99% Alumina Ceramic Lining Lined with high-purity 99% alumina ceramic, offering 8-10 times longer service life compared to standard polyurethane or rubber lined cyclones, significantly reducing replacement frequency and downtime costs.
Exceptional Classification Accuracy Precision-engineered geometry (inlet, vortex finder, apex) ensures sharp particle size separation with cut points ranging from 10-150 microns, delivering consistent overflow and underflow product quality.
Wide Application Range Suitable for gold, copper, iron, coal, phosphate, and other mineral processing circuits including grinding classification, desliming, dewatering, and dense medium recovery.
Full Size Range Available Available in diameter from 100mm to 660mm (FX100 to FX660), accommodating feed flow rates from 1 m³/h to 400+ m³/h, suitable for both small pilot plants and large-scale mine operations.
Modular & Easy Maintenance Design Flanged sectional assembly allows individual worn components (apex, vortex finder, cylinder, cone) to be replaced independently without dismantling the entire unit, minimizing maintenance time and cost.
High Pressure & High Density Feed Tolerance Engineered to handle feed slurry with solid content up to 60-70% by weight and operating pressure up to 0.25 MPa, ideal for high-throughput mining processing plants.
Corrosion & Chemical Resistant Ceramic lining combined with corrosion-resistant outer casing withstands highly acidic and alkaline slurry environments, ensuring stable performance in aggressive process conditions.
Energy Efficient No Moving Parts Gravity and pressure-driven separation with zero rotating components means ultra-low energy consumption, no lubrication required, and virtually maintenance-free operation.
Cyclone Cluster / Battery Configuration Supported Multiple units can be assembled into cyclone clusters or batteries to match any required capacity, with manifold feed distributors available




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
3 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.