We afford Hollow sucker rod, high strength sucker rod, sucker rod and coupling. all made by high quality alloy steel with advanced heat treatment.
Rod accessories include sucker rod adapter, sucker rod couplings and variable diameter nylon couplings, sucker rod nylon stabilizers, sucker rod roller stabilizers, rod clamps, rod sealing devices, etc.
Comprehensive and Solid Supply Assurance System
As a professional one-stop manufacturer and supplier of equipment, we have always centered on meeting diverse engineering needs, building a full-range product matrix. Whether it is surface equipment such as drilling rigs, mud pumps and derricks, or underground drilling tools like drill pipes, drilling tools, diamond bits, reamers, etc., we can provide stable and reliable product support to ensure seamless connection of project links.
Rooted in and dedicated to the industry, we take high-standard product quality as the foundation, focus on efficiency improvement and safety guarantee, and through full-chain supply services, provide solid support for the smooth progress of major projects, effectively safeguarding customers' core interests and operational results.
Q
A
Q: How long is your delivery time? A: For sucker rod, Normally 7 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to your quantity.
Q: What is your terms of payment? A: Payment<=1000USD, 100% in advance. * 30% down payment through T/T within 2days after signing the contract. * 70% balanced payment after inspection before delivery from factory by T/T. * We also accept order on line through
Q:How can we guarantee quality? A: With a pre-production sample before mass production; Always final Inspection before shipment
Q:Can you produce products with my own brand? A:Yes,we can offer OEM plate or certification services.
Q:Do you have any international certificate? A:Yes,we have API, ISO and etc.




-
Step 1
Payment and order readiness
Minimum order: 10000 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.