Operation process of vertical lead smelting furnace: Used car batteries · Crushing · Sorting · Elevator conveying · Lead furnace melting · Lead refining · Free cooling matching cooling furnace and bag dedusting equipment
Configuration Table of Vertical Melting Furnace with a Daily Output of 30 tons
| Serial number | Device Name | Quantity | Specification and model | Equipment power |
| 1 | Bucket elevator | 1 | 300 | 1.5KW |
| 2 | Vertical melting furnace | 1 | DN1000/1300*5500 | |
| 3 | Boiler supply fan | 1 | No6.3A | 2-11KW |
| 4 | Cooling and ash collection room | 2 | 6000*2000*3500 | |
| 5 | 264 bag dust collector | 1 | 6000*4000*4000 | |
| 6 | Boiler induced draft fan | 1 | No7C | 2-22KW |
| 7 | Smoke exhaust duct | 1 | DN800 | |
| 8 | Chimney | 1 | DN450X6000 |
The vertical lead smelting furnace is a new type of environmentally friendly equipment developed through modern technology, precision calculation, and years of use. After countless innovations and renovations, the flue gas is cooled by circulating water and then filtered through a bag filter before being discharged. There is no wastewater discharge during the production process, which is efficient and environmentally friendly. The complete set of equipment consists of a vertical furnace, a melting chamber, a dehydration and reduction greenhouse, a circular flue, a bag filter, and ventilation ducts.
| Model | 24-hour production | Total weight | Power | Production floor area |
| HJ-10 | 10ton | 10.5 | 24KW | 100 |
| HJ-20 | 20 | 15 | 27.5KW | 150 |
| HJ-30 | 30 | 19 | 35.5KW | 300 |
| HJ-50 | 50 | 26 | 48KW | 400 |
| HJ-100 | 100 | 33 | 80KW | 600 |
Raw materials are the lead separated by the battery separation section (automotive battery, truck battery, electric bicycle battery, etc.)
Notice: 1.Big machines packed in nude or shipping in containers. 2. Spare parts packed in wooden case. 3. If you have any special requirement, we will pack as request.
Q: Are the machines you produce all of a uniform standard?
A: We will customize the machine for you according to your requirements.
Q: How to choose the right machine?
A: Please tell us your raw materials for production and the output you need as well as other requirements, we will recommend the most suitable products for you.
Q: How is the machine installed?
A: Under normal circumstances, we provide the whole machine for delivery. We will provide detailed installation drawings for each machine. We can also arrange technicians to go to the site to guide the installation.
Q: What about the supply of main parts?
A: Spare parts will always be available at cost and a spare parts list will be provided when you purchase the machine.
Q: Do you test the machine before shipping?
A: Yes, we will test each machine and




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.