The advantages of my company
From factory establishment, we have been insisting manufacturing full set of beneficiation equipments. With over 30 years’ experience, we still enjoy this advantage to give the clients mature workflow, reasonable design, accurate manufacture, best after-service. If you want to beneficiation ferrous ore or non-ferrous ore, you are luck to choose me- the right one.
Small mining equipment cover: feeder, crusher, ball mill, classifier, vibrating screen, rocking bed, magnetic separator, cylinder mixer, mix tank,rotary dryer, rotary kiln flotation machine and so on. We can provide full specifications of large and medium-sized mineral machinery, metallurgy equipment and building materials equipment, such as crushing machines, mineral processing equipment, cement production lines, rolling mill equipment, etc.
Pls feel free to
1) PE series jaw crusher and fine jaw crusher( Cone crusher)
2) Ball mill and Sprial classifier (hydro cyclone)
Vertical mill for graphite
4) Flotation machine
1. The extracted ore should be crushed by jaw crusher initially. When it gets the reasonable fineness, it is transported into ball mill by belt conveyer and feeder, and is milled by ball mill.
2. The subtle milled ore gets the next procedure: classification. There is a theory that if the weights of solid particles are different, the sedimentations will be different, and the mixed ore can be classified by screw classifier or hydr cyclone.
3.The classified ore gets into flotation separator, we as per the ore grade and property different medicines are added according to different characteristics of ore, so that the needed ore is separated from others.
In order to make sure the final grade and the concentrate reach the maximum, we need to more stage grinding and flotation, we also will use the vertical mill together with the rod mill.
Usually we need to use 3-5 stage griniding and separtator, sometime even more stage and flotation.
4. Since the separated ore are wet, they should be dewatered by thickener and filter initially, and dried by drier. Finally, the dry minerals come into being. The specific production flow is as the photos.
Customer using site with more than 15 years photos
| No. | Equipment | Specification | QTY (SET) | Power (KW) |
| 1 | Hopper without support leg | 4000x4000 | 1 | |
| 2 | Vibrating feeder | GZT0724 | 1 | 1.5x2 |
| 3 | Jaw crusher | PE400X600 | 1 | 30 |
| 4 | Belt conveyor | B500=15m | 1 | 4 |
| 5 | Simmons Cone crusher | PGSB0611 | 1 | 30 |
| 6 | Belt conveyor | B500=15M | 1 | 4 |
| 7 | Vibrating screen With PU material 12mm, 3mm | 2YK1236 | 1 | 11 |
| 8 | Belt conveyor | B500=18M | 2 | 5.5x2 |
| 9 | Hopper with support leg Made at site | 200m3 | 1 | |
| 10 | Swaying feeder | BK600X600 | 1 | 1.1 |
| 11 | Belt conveyor | B500=12M | 1 | 4 |
| 12 | Wet ball mill | MQG2400X3600 | 1 | 280 |
| Forged balls B-2 | 120mm | 5 ton | ||
| Forged balls B-2 | 100mm | 8 ton | ||
| Forged balls B-2 | 80mm | 8 ton | ||
| Forged balls B-2 | 60mm | 5 ton | ||
| 13 | Wet polishing Ball mill | MQG1500X3000 Variable frequency motor | 2 | 75x2 |
| High alumina balls | 70mm | 5 ton | ||
| High alumina balls | 50mm | 7 ton | ||
| High alumina balls | 30mm | 5 ton | ||
| 14 | Vertical mill | YS800 | 2 | 15X2 |
| High alumina balls | 8 mm | 6t | ||
| 15 | Agitation tank | XB2500 | 1 | 15 |
| 16 | Flotation machine | SF2.8 | 8 | 11x8 |
| 17 | Flotation machine | SF4 | 15 | 15x15 |
| 18 | Concentrate Filter press 7TPH dry concentrate | XMZ500/2000-30U | 1 set | 11 |
| Stainless steel automatic turn over the liquid plate (optional ) | L=7.37m W=3m | 1 set | ||
| Receiving tank | 8.98mx250mmx250nn | 1 set | ||
| Belt conveyor | Width 1.67m L=10m | 1 set | 3 | |
| Feeding pump | Q=76-169m3/h H=62-80m, 55KKW | 1 set | 55 | |
| Air compressor | ventilatory capacity 3.8m3/min 22KW working pressure 8KG | 1 set | 22 | |
| Blow back storage tank | 5m3 | 1 set | ||
| 19 | Rotary dryer | ZT2.0X20m | 1 set | 30KW |
| Natural gas burner | RS510 | 1 set | ||
| Combustor | RS3270 | 1 set | ||
| Control system | HGJ2958 | |||
| Bag filter +30KW fans | 360m2 | 1 set | ||
| 20 | Square swinging screen | 2FYBS2036-4P | 1 set | 7.5KW |
1. Proving beneficiation technology and consultation
2. Raw ore testing and evaluation
3. Site chosen consultation and evaluation.
4. Site design and layout design.
5. Installation, erection and commissioning instruction
6. Workers training.
1. Which kind of raw material and the feeding size?
2. The capacity per day
3. The raw ore specific content and percent? (You had better send us analysis report)
4. The grade you want to get



-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.