Product details
This Heavy Duty 300m Crawler Water Well Drilling Rig Diesel Engine Core Drilling Equipment for 100-300m Deep Well Drilling provides robust power for continuous project execution.
Powered by a high-torque diesel engine, ensuring reliable operation in remote, off-grid locations like Southeast Asia and Africa.
The advanced crawler chassis adapts easily to muddy, mountainous, and rugged terrains, minimizing site preparation time for contractors.
Engineered for 100-300m depth, making it versatile enough to handle both shallow agricultural irrigation wells and deep municipal water projects.
Built-in high-efficiency core drilling capabilities allow fast penetration through soil and hard rock, lowering the overall cost per meter drilled.
Frequently asked questions
The maximum drilling depth of this heavy-duty crawler water well drilling rig is 300 meters, which is specially designed for deep well drilling scenarios ranging from 100m to 300m, fully meeting the demand for deep water extraction.
Yes, it is fully suitable for off-grid operations. The rig is equipped with a high-performance diesel engine as its independent power source, which can provide stable and continuous power support without relying on grid electricity, making it applicable to remote areas without power supply.
Absolutely. The crawler chassis of this drilling rig is designed with heavy-duty structure, which has strong ground adhesion, good stability and excellent passability. It can easily adapt to mountainous, hilly, muddy and other complex terrains, ensuring smooth movement and stable operation of the machine in mountainous areas.
The diesel engine of this equipment requires regular routine maintenance to ensure long-term stable operation, mainly including the following items: 1. Regularly replace engine oil, oil filter and air filter (recommended every 200 working hours); 2. Check the cooling system regularly to ensure sufficient coolant and normal operation of the radiator; 3. Inspect the fuel system, clean the fuel filter and ensure the purity of diesel oil; 4. Check the tightness of all pipelines and connectors regula
Yes, we provide professional OEM customization services for this core drilling equipment. We can customize according to your specific needs, including but not to the brand logo, color, partial structural adjustment, and configuration optimization of the equipment, to meet your personalized market and operation needs.
The time required to drill a 300m deep well depends on the actual stratum condition. Under normal stratum (such as soil layer and loose rock stratum), it usually takes 3-5 days to complete drilling; if the stratum is complex (such as hard rock stratum), the drilling time may be extended to 5-7 days. The rig is equipped with high-efficiency core drilling components, which can effectively improve drilling speed and shorten construction period.
This crawler water well drilling rig can be transported in two ways according to the site distance and road conditions: 1. For short-distance transportation (within 50km), the rig can move directly to the construction site through its own crawler chassis without disassembly; 2. For long-distance transportation, the rig can be disassembled into main components (such as drill tower, chassis, diesel engine) and loaded into a flatbed truck for transportation, which is convenient, safe and can avoid
We provide comprehensive after-sales support for drilling contractors to ensure smooth construction, including: 1. Free technical training; 2. Spare parts supply; 3. On-site maintenance;4. Long-term technical consultation