@ Established in 2008 @ Passed ISO9001-2000 & 2008 @ Supply OEM/ODM Manufacturing. @ Designed and manufactured to intermix and interchange major global brands. @ 2 Hour's Drive from Shanghai Airport. Main product: @ Twin Ferrules Series Tube Fittings @ Ball Valves @ Needle Valves @ Check Valves @ Instrument Manifolds @ Relief Valve
Warehouse
Workshop
Packing @ As per customer's specified requirements @ Standard Export Packing:Carton+Pallet Shipping @ Small order: By express, TNT/ DHL/ UPS/ Fedex etc. @ Large order: By sea or By air @ Choose the best suitable way as your need.
1. What is the acceptable MOQ? For this elbow male connector,our acceptable MOQ is 10pcs. 2. What is the Delivery time? For samples,we usually have them in stock, so the delivery time will be quite short. For normal order, the delivery time should be in 2 weeks. 3.What is the acceptable payment term?








-
Step 1
Payment and order readiness
Minimum order: 100 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
10 days
-
Step 3
Packaging and dispatch
Economy · Estimated delivery: Sep 29–Oct 23 (28–52 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.