100m 200m water well drilling rig,tractor drillingmachine with mud pump and all accessories
1.1 Rig Application
1.1.1 The rig is suitable for survey and prospecting, geophysical exploration, roads and buildings and other exploration and play blasthole drilling bits projects.
1.1.2 Drilling bits can be chosen according to different strata.
1.2 Rig Features
1.2.1 hydraulic automatic feed mechanism, improve drilling efficiency, reduce manual labor workers.
1.2.2. Ball holding mechanism instead of using the chuck, can implement non-stop down the lever, easy to operate, safe and reliable.
1.2.3. With bottom hole pressure gauge indicates the pressure, easy to grasp hole situation.
1.2.4 The handle centralized, easy to operate.
1.2.5. Light weight, decomposition and strong, easy to move, adapted to the plains or mountain areas.
| Borehole diameter | 75,91,110,130,150,300mm |
| Drilling depth | 200,150,100,70,50,30m |
| Drill pipe diameter | 42,50,60mm |
| Angle range | 90°-75° |
| Size ( L*W*H ) | 1433*697*1273mm |
| Weight(without power unit) | 525kg |
| Gyrator | |
| Spindle speed(4-speed) | 71, 142, 310, 620r/min |
| Spindle stroke | 450mm |
| Upward max speed of spindle(no load) | 0.05m/s |
| Downward max speed of spindle(no load) | 0.067m/s |
| Max feeding force of spindle | 15KN |
| Max lifting force of spindle | 25KN |
| Max output torque of spindle | 1.25KN.M |
| Hoist(winch) | |
| Max.lifting capacity(single rope) | 15KN |
| speed | 19, 38, 84, 168r/min |
| Hoist drum linear velocity(two levels) | 0.166, 0.331, 0.733, 1.465m/s |
| Drum dia | 140mm |
| Wire rope dia | 9.3m |
| Wire rope capability | 35m |
| Brake dia | 252mm |
| Brake belt width | 50mm |
| Oil pump | |
| Model | YBC-12/125 |
| Rated pressure | 12.5Mpa |
| Displacement | 12ml/r |
| Rated speed | 2000r/min |
| Power(diesel engine or motor) | |
| Model(diesel engine) | ZS1115 |
| Rated power | 16.2kw |
| Rated speed | 2200r/min |
| model (motor) | Y160-4 |
| Rated power | 11kw |
| Rated speed | 1460r/min |
What s app


-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
5 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.