Exhaust gas purification system for diesel generator sets adapts the diesel particulate filter (DPF) as the core components. This kind of treatment is much better than the traditional ways such as water filtrationand electrostatic precipitator(ESP), the new technology make the black smoke purification rate can be up to 85%-98%. Besides, the use of the most advanced Catalyst Continuously Regenerating Technology (CCRT) can make the capture of particulate matters (PM) completely automatic combustion, and effectively remove CO, HC and other harmful gases, without adding any more pollution.
Diesel oxidation catalyst (DOC) as the core components of exhaust gases filtration system, it can promote chemical oxidation of CO and HC as well as the SOF portion of diesel particulates.
Main System Component
| System Component | System Component |
| Air inlet module | Air outlet module |
| Regeneration heater module | Automatic regeneration system |
| Diesel oxidation catalyst (DOC) | Diesel particulate filter (DPF) |
| Bypass module | Butterfly valves (manual or electric) |
| PLC control system |
Product Model
| Model | ELT-20 | ELT-40 | ELT-60 | ELT-80 | ELT-100 |
| Reference power(KW) | 1-200 | 200-400 | 400-600 | 600-800 | 800-1000 |
| Model | ELT-120 | ELT-140 | ELT-160 | ELT-180 | ELT-200 |
| Reference power(KW) | 1000-1200 | 1200-1400 | 1400-1600 | 1600-1800 | 1800-2000 |
| Application: Exhaust gas filtration system is widely used in 1-2000kw diesel power generation set. |
Typical Reduction Efficiency
| Item | Parameter |
| Particulate Matter (PM) removal rate | 85-98% |
| CO removal rate | 75-90% |
| HC removal rate | 75- 90% |
| NOx removal rate | 30-40% |
| Note: We can be designed according to customer requirement. |



-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
20 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.