| Model | ZP175 | ZP205 | ZP275 | ZP375 | ZP495 | |
| Max. static load | kN | 2250 | 3150 | 4500 | 5850 | 7250 |
| Ton | 250 | 350 | 500 | 650 | 800 | |
| Bore diameter | mm | 444.5 | 520.7 | 698.5 | 952.5 | 1257.3 |
| in | 17-1/2 | 20-1/2 | 27-1/2 | 37-1/2 | 49-1/2 | |
| Gear Ratio | 3.58 | 3.22 | 3.67 | 3.56 | ||
| Distance from table axis to the center of inner row of sprocket | Mm | 1118 | 1353 | |||
| in | 44 | 53-1/4 |
Lake Petro is located in City, which is famous for Shengli Oilfield and the largest manufacturing hub of petroleum equipment. Following the principle of “quality first, science and technology innovated, people oriented”, every Lake Petro person is sparing no effort to provide the customers with best products and services. Our products are based on advanced
How can I place order?
A: You can
How can I pay you? A: After you confirm our PI, we will request you to pay. T/T (HSBC bank), L/C, D/P, Western Union are the most usual ways we are using. If you want to use other way, please tell me, we can discuss. What’s the order procedure? A: First we discuss order details, production details by
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank), L/C, D/P, Western Union are the most usual ways we are using. If you want to use other way, please tell me, we can discuss.
A: First we discuss order details, production details by
A: replacement. If there are some defective items, we usually credit to




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
45 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.