ZJ70/4500 Skid-Mounted Refurbished Drilling Rig
1. Product Overview
This unit is a ZJ70/4500 onshore skid - mounted oil drilling rig, fully refurbished to industry high standards. It is available in two versions: ZJ70J mechanical drive and ZJ70DB AC VFD electric drive. Featuring a modular skid - integrated structure and low-level design for integral hauling, it enables easy installation and fast relocation.
It is mainly used for onshore deep oil & gas wells, geothermal wells, deep water wells, mineral exploration wells, cluster wells, directional wells and horizontal wells. It operates reliably in extreme climates from - 45°C to +55°C, including deserts, Gobi, plateaus and remote alpine mining areas. The rig complies with API and Chinese industry standards, has no structural damage and no major accident history, and its performance after refurbishment is close to new equipment.
2.1 Drilling Capacity
2.2 Mast & Substructure
2.3 Rotary System
2.4 Mud & Power System
3.1 Borehole Diameter
3.2 Applicable Bit Types
PDC bits, tricone roller bits, diamond core bits, directional bits, reaming bits - suitable for soft, medium-hard, hard and gravel formations.
3.3 Drilling Methods
Conventional rotary drilling, top drive drilling (optional), mud positive circulation, air/foam drilling, directional & horizontal drilling - flexible for various formations and trajectories.
4.1 Steel Structure
Mast, substructure and drawworks base: full NDT inspection, straightening, weld repair, sandblasting and heavy anti-corrosion coating (≥200 μm).
4.2 Hoisting Components
Crown block, traveling block, hook: all bearings replaced, load tested (1.25× rated load). Drawworks: fully disassembled & overhauled, worn gears/brakes replaced, no-load & full-load run-in passed.
4.3 Hydraulic & Pneumatic Systems
All valves, cylinders and high-pressure lines: disassembled, cleaned, seals 100% replaced. 24 - hour zero - leak pressure test. Pneumatic system: aging components renewed.
4.4 Electrical & Control System
Motors, transformers, VFDs: insulation tested; aging cables & faulty components replaced. PLC console & driller cabin fully calibrated. All pressure, torque and depth gauges recalibrated or replaced.
4.5 Main Assemblies
Rotary table & mud pumps: complete strip - down, bearings, liners, pistons and valves replaced; clearances adjusted for long-term stability.
4.6 Safety System
Anti-collision limit, emergency stop, anti-jam protection: full functional test. Fire protection, lightning protection, handrails and walkways: repaired or replaced to meet site safety requirements.
5.1 Standard Package
5.2 Optional Upgrades
6. Key Advantages
7. Price
Price depends on manufacture year, refurbishment grade, brand, overall condition, optional equipment and delivery terms.
8. Warranty & Documentation
-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
90 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.