API 4F single drum XJ450 80ton truck-mounted pulling unit
XJ650 ( 120t ) workover& drilling rig is one of the best selling, single engine and high power, self- propelled rig. The rig adopts 12x8 driven type chassis, Caterpillar engine and Allission transmission (can use brand also), and double drum draw-works. Max. hook load is 1580KN. The rig equipped with rotary table, platform, and swivel etc.
Adopts double section hydraulic lifting, flexible mast, the height is 35m.
Equipped with double CAT C18 engine and Allission M6620 transmission. The performance is stable and reliable.
The driven model of self-propelled chassis is 12x8. Single cab. With heater.
The main drum adopts ATD324 disc brake, and assis brake is air control disk type brake.
Anti-collision crown block.
Fingerboard of monkey board is longitudinal arrangement, the beam space can be adjusted. Equipped with aid climbing implement and escape device.
All pneumatic pipelines adopt FESTO quick-coupling and pipeline.
Meter system adopts 24V DC, and lighting system supplied power by external AC power.
| Description | XJ650(120t) | ||
| Workover depth | Φ73mm (2 7/8”upset tubing) | m | 8500 |
| Service depth | Φ73mm( 2 7/8”DP) | m | 7000 |
| Φ88.9mm( 3 1/2”DP) | m | 5500 | |
| Φ114mm(4 1/2”DP) | m | 4200 | |
| Drilling depth | 2000 | ||
| Rated hook load | 1200 | ||
| Max. hook load | 1580 | ||
| Engine model | CAT C18 | ||
| Engine power | 470 ( 630 ) | ||
| Transmission | Allision M6620 | ||
| Chasssis driving form | 12x8 | ||
| Approach/departure | 25°/ 16° | ||
| Min. ground clearance | 310 | ||
| Derrick height | 35 | ||
| Derrick type | front opened, double section hydraulic lifting, flexible mast | ||
| Valid rope number | 8 ( 4x5 ) | ||
| Hoist rope diameter | Φ29 | ||
| Transportation dimensions ( length x with x height ) | 19.90x3.10x4.37 | ||
| Total weight | 55000 | ||
| Drum | Single / double drum | ||
| Main drum assist brake system | Air control disk type brake / hydraulic control disc brake / hydraulic brake |


-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
90 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.