| Standard | ASTM A213,A312,ASTM A269,ASTM A778,ASTM A789,DIN 17456, DIN17457,DIN 17459,JIS G3459,JIS G3463,GOST9941,EN10216, BS3605, GB13296 | |
| Material | 304,304L,309S,310S,316,316Ti,317,317L,321,347,347H,304N,316L, 316N,201, 202 | |
| Surface | Polishing,annealing,pickling,bright | |
| Type | hot rolled and cold rolled | |
| stainless steel round pipe/tube | ||
| Size | Wall thickness | 1mm-150mm(SCH10-XXS) |
| Outer diameter | 6mm-2500mm (3/8"-100") | |
| Delivery time | Prompt delivery or as the order quantity. | |
| Package | Standard export seaworthy package,or as required. | |
| Application | Widely used in petroleum,foodstuff,chemical industry,construction, electric power,nuclear,energy,machinery,biotechnology,paper making,shipbuilding,boiler fields. Pipes also can be made according to the customer's required. | |
| Contact | If you have any questions,please feel free to contact me. | |
| Container size | 20ft GP:5898mm(Length)x2352mm(Width)x2393mm(High) 24-26CBM 40ft GP:12032mm(Length)x2352mm(Width)x2393mm(High) 54CBM 40ft HC:12032mm(Length)x2352mm(Width)x2698mm(High) 68CBM |
City, Shandong Province, is one of the biggest steel pipe suppliers in tablished in 1998
relationships with many customers in and abroad. Our products have been exported to many countries, such as Asia,, Middle East, America, Europe,etc.
Our main products: seamless steel pipe,carbon steel pipe,alloy steel pipe stainless steel pipe, precision steel pipe,hot rolled steel plate, cutting steel plate and some other products. With a good reputation among domestic and overseas,we have many customers around the world.
We are very glad to establish a long-term business relationship with you on the basis of
mutual benefit. If you are interested in any of our products, please feel free to



-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
3 days
-
Step 3
Packaging and dispatch
Premium · 3-day dispatch · Estimated delivery: Sep 7–Sep 22 (6–21 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.