Hydrophobic 4*6mm ePTFE Tubing Chemical resistance Expanded PTFE Tube for Industrial wastewater filtration
ePTFE is produced by mechanically expanding biocompatible PTFE to produce a microporous structure of solid nodes interconnected by fibrils. This versatile and flexible material can be customized in many different and complex geometries depending on the unique environment it needs to operate in.
Characteristic
High and low temperature preservation( -200-260℃ )
Chemical and Corrosion resistance
Biocompatible – a USP Class VI resin that is safe and trusted for use within the human body.
Easy to process: capable of flipping edges
Application
Industrial wastewater filtration
Stent and frame coverings (e.g. stent grafts and heart implants)
Medical textiles (e.g. patches, scaffolds and mesh)
Vascular grafts and intestinal liners
1. who are we? We are based in Guangdong,, start from 2011,sell to Domestic Market(70.00%),North America(3.00%),South America(3.00%),Africa(3.00%),Oceania(3.00%),Mid East(3.00%),Western Europe(3.00%),Eastern Europe(2.00%),Southeast Asia(2.00%),Eastern Asia(2.00%),Central America(2.00%),Northern Europe(2.00%),Southern Europe(00.00%),South Asia(00.00%). There are total about 11-50 people in our office. 2. how can we guarantee quality? Always a pre-production sample before mass production; Always final Inspection before shipment; 3.what can you buy from us? FEP PTFE PFA Tube,Bar,Sheet,Film,Fitting 4. why should you buy from us not from other suppliers? The company's core strengths are as follows: 1, a real producer, may accept inspection of the plant 2, more than 18 years of production experience 3, experienced staff, strict factory inspection 4, fast delivery, Stable quality 5. what services can we provide? Accepted Delivery Terms: FOB,CIF; Accepted Payment Currency:USD,EUR,HKD; Accepted Payment Type: T/T,L/C; Language Spoken:English,Chinese




-
Step 1
Payment and order readiness
Minimum order: 100 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
Lead time will be confirmed with your quotation.
-
Step 3
Packaging and dispatch
Economy · Estimated delivery: Sep 30–Oct 16 (29–45 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.