JC660 DTH Rock Blasting Drilling Rig
| DRILLING RIG | Unit | JC660 |
| Drilling Range | mm | 90-130 |
| Maximum Drilling Depth | m | 60 |
| Horizontal Drilling Height | mm | 3600 |
| Drill Rod Diameter | mm | 76 |
| Drill Rod Length | mm | 4000 |
| Number of Rods Stored | PCS | 5+1 |
| Automatic Rod Handling Drilling Depth | m | 24 |
| ENGINE | ||
| Model | Yuchai YCA08280-T301 | |
| Emission Standard | National III Emission Standard | |
| Operating Speed | rpm | 2200 |
| Rated Power | kW | 206 |
| Fuel Tank | L | 550 |
| AIR COMPRESSOR | ||
| Manufacturer | BSC BOSS Twin-Screw Compressor | |
| Discharge Pressure | MPa | 2 |
| Discharge Flow | m³/min | 16 |
| PROPULSION | ||
| Slide travel | mm | 4115 |
| Rapid feed rate | m/min | 60 |
| Lifting force | KN | 20 |
| Rotational speed | rpm | 0-140 |
| Rotational torque | N.m | 0-3400 |
| Ambient temperature | ℃ | 35/50 |
| Altitude | m | ≤2500 |
| TRAVEL SYSTEM | ||
| Maximum travel speed | km/h | 0-2.5 |
| Ground clearance | mm | 25 |
| Climbing ability | ° | 350 |
| Track width | mm | +/-6 |
| DUST COLLECTION | ||
| Filtration Area | ㎡ | 16 |
| Number of Filter Cartridges | 16 | |
| Dust Suction Pipe Diameter | 5" | |
| Motor Speed | rpm | 3700 |
| SHIPPING DIMENSIONS | ||
| Length | mm | 9000 |
| Width | mm | 2700 |
| Height | mm | 3300 |
| Weight | kg | 13500 |
| *Standard drilling rig parameters, excluding drill rod kits and optional components |
$56,231 / set
A: Yes. JCDRILL is a leading and certified manufacturer of drilling machinery. We provide a comprehensive range of products to meet your diverse project requirements.
A: We accept both T/T and L/C payment terms. For T/T: 30% deposit in advance, with the remaining 70% payable before shipment. For L/C: We accept 100% irrevocable L/C without soft clauses.
A: As an experienced international supplier, JCDRILL supports all Incoterms 2010. Our most commonly used terms include FOB, CIF, CFR, and CIP.
A: Delivery time depends on the product type: Mud pump products: approximately 3–15 days for production Standard machines: typically available for delivery within 15 days In many cases, we can arrange immediate shipment for in-stock equipment.
A: We offer 24/7 year-round customer support, including holidays. Our service commitment: Response within 15 minutes Issue resolution within 24 hours
A: We operate global spare parts centers stocked with specialized components. Standard delivery: within 72 hours Maximum delivery time: within 1 week




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
45 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.