XJ750 (150t)workover & drilling rig
XJ750 (150t)workover& drilling rig is one of the best selling, high power, self- propelled rig. The rig adopts 14x8 driven type chassis, double Caterpillar engine and Allission transmission, and double drum draw-works. Max. hook load is 1700KN. The rig equipped with rotary table, platform, and swivel ntinuous pumping truck
Highlight
1.Adopts double section hydraulic lifting, flexible mast, the height is 38m.
2.Equipped with double CAT C15 ACERT AIII engine and Allission M5620HR transmission. The performance is stable and reliable.
3.The driven model of self-propelled chassis is 14x8. Single cab. With heater. The main drum clutch adopts ATD330H airbag disc type, and bailing drum clutch is ATD124H airbag disc type.
pound transfer case adopts seven axle parallel transmission.
5.Rotary table transmission can make the rotary table 5 forward 5 reverse.
6.All pneumatic pipelines adopt FESTO quick-coupling and pipeline.
ter system adopts 24V DC, and lighting system supplied power by external AC power.
specifications
| Description | XJ750(150t) | ||
| Workover depth | Φ73mm (2 7/8"upset tubing) | m | |
| Service depth | Φ73mm( 2 7/8"DP) | m | 8000 |
| Φ88.9mm( 3 1/2"DP) | m | 6500 | |
| Φ114mm(4 1/2"DP) | m | 5000 | |
| Drilling depth | m | 3000 | |
| Rated hook load | kN | 1500 | |
| Max. hook load | kN | 1700 | |
| Engine model | CAT C15 ACERT AIII*2 | ||
| Engine power | KW(hp) | 403(540)*2 | |
| transmission | Allison M5610HR*2 | ||
| chasssis driving form | 14*8 | ||
| Approach/departure | 33°/17° | ||
| Min. ground clearance | mm | 285 | |
| Derrick height | m | 38 | |
| Derrick type | front opened, double section hydraulic lifting, flexible mast | ||
| Valid rope number | 10(6*5) | ||
| hoist rope diameter | mm | Φ29 | |
| Transportation dimensions(length x with x height) | m | 22.2×3.1×4.45 | |
| Total weight | kg | 76000 | |
| Drum | Single / double drum | ||
| Main drum assist brake system | Air control disk type brake |




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
90 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.