Skip to Content

Browse

Certifications EN 74

EN12810 Certified Q355B Steel Ringlock Scaffolding System Hot Dip Galvanized Modular Layher Scaffolding for Construction Project

Available for enquiry 0.0 · 0 reviews
USD

30.00 30.0 USD 30.00

Not Available For Sale

Minimum order quantity: 100 Units

Key attributes

View all
Material
Steel, Q355 steel
Height
6FT
Performance level
High Strength
Application
Office Building, Warehouse, Workshop, Farmhouse, Courtyard
After-sale Service
Online Technical Support
Warranty
N/A
Product description

Highlights at a glance

  • Ringlock Scaffolding: Secure and efficient construction solution for building projects.
  • Hot Dip Galvanized Finish: Durable and corrosion-resistant coating for long-lasting performance.
  • 1-Year Warranty: Peace of mind with extended protection against defects.
  • Online Technical Support: Accessible assistance for any inquiries during installation and use.
  • Modular Design: Easy assembly and disassembly for flexible and reusable solutions.
  • Certifications & compliance
    EN 74
    Structural Safety Certified
    Frequently asked questions

    Our company has a steel base, one-stop procurement, good price, excellent quality, fast delivery,we not only have our own factories but also have shares in some other enterprises.

    Yes, if the sample is available in stock.

    Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.

    It is based on the order, normally 25-45 days after receiving the deposit or L/C at sight.

    Always a pre-production sample before mass production;Always final Inspection before shipment

    100% irrevocable L/C at sight. Or T/T, 30% advance, and balance against the copy of B/L within 3-5 days.
    Description images
    Product detail
    Product detail
    Product detail
    EN 74
    Packaging and fulfilment
    • Step 1

      Payment and order readiness

      Minimum order: 100 Units

      Payment terms, specifications, and order details are confirmed before preparation begins.

    • Step 2

      Preparation

      7 days

    • Step 3

      Packaging and dispatch

      Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days

      Final packing, freight, and delivery dates are confirmed before dispatch.

    Technical specifications
    Other details 22 fields
    Material
    Steel, Q355 steel
    Height
    6FT
    Performance level
    High Strength
    Application
    Office Building, Warehouse, Workshop, Farmhouse, Courtyard
    After-sale Service
    Online Technical Support
    Warranty
    N/A
    Design Style
    Contemporary
    Project Solution Capability
    Online Technical Support
    Place of origin
    China, Tianjin
    Type
    ringlock scaffolding, Ringlock Scaffolding Systems
    Model number (Specification)
    CLS0102
    Keyword
    Ring lock scaffold
    Surface Treatment
    Hot dip galvanized
    Standard
    BS1139
    Usage
    Construction Usage
    MOQ
    100 Pieces
    Payment terms
    30%TT Advance + 70% Balance
    Selling Units
    Single item
    Single package size
    50X50X50 cm
    Single gross weight
    50.0 kg
    Color (Product option)
    Silver
    Certifications & Compliance
    EN 74
    Lead time
    7 days
    Minimum order
    100 Units

    Customer reviews

    0.0 (0)

    No reviews yet

    Be the first customer to review this product.

    Write a review

    Up to 5 JPG, PNG or WebP images; 5 MB each.

    Request custom sourcing

    Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

    Best-match productsCompetitive quotesFast turnaround
    Request custom sourcing

    Upload your requirements

    Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

    XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
    XLSX
    Files are sent securely.