Product details
Premium Cast Polyurethane Lining Superior Wear & Impact Resistance Manufactured from high-quality cast polyurethane (Shore A 90-95), offering excellent abrasion resistance combined with outstanding elasticity and impact absorption ideal for handling coarse, high-density slurries that would cause premature cracking in ceramic or rubber lined cyclones.
Lightweight Construction Easy Handling & Installation Polyurethane is significantly lighter than ceramic or cast iron, making the cyclone easier to transport, handle, and install on-site, reducing labor costs and installation time especially in remote mining locations.
Excellent Elasticity Self-Protecting Against Impact The natural elasticity of polyurethane allows it to absorb and deflect sudden impacts from coarse ore particles and tramp material, preventing cracking and chipping that commonly occurs with brittle ceramic linings under high-impact conditions.
Precision Classification Performance Engineered inlet, vortex finder, and apex geometry ensures sharp particle size separation with cut points from 10-150 microns, delivering consistent overflow fineness and underflow density for stable grinding circuit performance.
Modular Design Fast & Low Cost Maintenance Flanged sectional construction allows individual worn components apex (spigot), vortex finder, cylindrical section, and cone to be replaced independently without removing the entire cyclone from the circuit, minimizing downtime and maintenance expenditure.
Corrosion & Chemical Resistant Polyurethane lining is highly resistant to a wide range of acids, alkalis, oils, and salts, ensuring reliable performance when processing chemically aggressive slurries in gold, copper, phosphate, and coal washing circuits.
Wide Temperature Range Suitable for slurry operating temperatures from -20°C to +80°C, covering the full range of mineral processing environments from cold climate open-pit mines to tropical processing plants.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
3 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.