Product details
High Productivity: Produces film efficiently for increased output.
Energy Saving: Operates with minimal energy consumption for cost-effectiveness.
Single-Screw Design: Ensures consistent film quality with precise control.
97 RPM Screw Speed: Maintains optimal speed for smooth production process.
Single Screw Type: Simplifies maintenance and reduces complexity.
Frequently asked questions
We are the earliest plastic extrusion machine manufacturer in Qingdao. We have 22 years of mechanical manufacturing experience. Our pursuit is machine quality and customer satisfaction. Please trust that we are capable of providing you with high-quality machines and comprehensive services.
Pre-sale communication, feasibility report, contract signing, customized production, pre-delivery machine testing, package delivery, engineer installation, technical support
The first installment should be paid by wire transfer, with the amount being 30% of the total amount. The remaining amount (70% of the total amount) should be paid through wire transfer or an irrevocable letter of credit (immediate) before shipment.
Qingdao Port FOB Delivery period: 60 working days after receiving the advance payment. The seller will notify the buyer for inspection. The seller should complete the packaging of the goods and prepare for shipment within 15 working days after receiving the full payment. Transportation supervision: The seller should inform the buyer of the exact transportation time. The buyer should arrange the transportation supervision scope.
Warranty period: 12 months from the start of the machine operation in the customer's warehouse The seller guarantees to provide free services and spare parts throughout the equipment warranty period. Lifetime service: The seller will provide lifetime service for the sold goods after the 12-month warranty period and charge the buyer for the cost of the required spare parts.
After the machine is completed, the seller should notify the buyer for inspection before shipment. The seller guarantees that the sold goods are in good performance. The seller should deduct the inspection material cost from the inspection materials sent from the factory. The buyer should go to the seller's factory for inspection or the buyer can invite any third party to enter the seller's factory for inspection.
If the buyer needs, the seller should send a technical team to the buyer's factory for installation and testing. The buyer should increase the price of the entire food/venue and group purchase information (airplanes, food, hotels, etc.). And charge the engineer 100 US dollars per day.