Description Sucker Rod Centralizer
Sucker Rod Guide, or Sucker Rod Centralizer, is mainly used in pumping well to centralize sucker rod and reduce the friction between tubing and sucker rod. Can protect the sucker rod from wiping with tubing pipe.
The main difference between rotating twist on nylon sucker rod centralizerand non-rotating twist on nylon sucker rod centralizeris that the non-rorating twist on nylon sucker rod centralizernylon sleeve molded on alloy steel body. But rotating twist on nylon sucker rod centralizercan rotate freely. This makes rotating rod guide more flexible when it works.
Our API rotating sucker rod centralizer/Rotating Wear Resisting Sucker rod guides are made up of three components
1.Spindle - 4140 (centralizer body).
2.Sleeve - Nylon co-polymer, to resist sand imbedment. Impervious to aromatics and H 2 S.
3.The temperature rating is 120°C (250°F)
Models Parameter
| APPLICATION | MAXIMUM ROD LOAD | DIMENSIONS A(INCH) | DIMENSIONS B(INCH) | DIMENSIONS C(INCH) | WEIGHT |
| 5/8″ Rod / 2-3/8″ Tubing | 19,600 | 1.5 | 27 | 1.8 | 10lbs |
| 3/4″ Rod / 2-3/8″ Tubing | 19,660 | 1.5 | 27 | 1.8 | 10lbs |
| 5/8″ Rod / 2-7/8″ Tubing | 19,600 | 1.5 | 27 | 2.25 | 10lbs 2oz |
| 3/4″ Rod / 2-7/8″ Tubing | 19,600 | 1.5 | 27 | 2.25 | 10lbs |
| 7/8″ Rod / 2-7/8″ Tubing | 22,400 | 1.625 | 27 | 2.25 | 11lbs 5oz |
| 3/4″ Rod / 3-1/2″ Tubing | 19,600 | 1.5 | 29 | 2.75 | 12lbs 6oz |
| 7/8″ Rod / 3-1/2″ Tubing | 22,400 | 1.75 | 29 | 2.75 | 15lbs |
| 1″ Rod / 3-1/2″ Tubing | 35,000 | 2 | 29 | 2.75 | 19lbs |
We have 9 factories, more than 500 employees, and many kinds of production equipments. We have certificates of API 5CT,6A,10D,11AX,11E, ISO 14001 and 9001. With 10 years exporting experience,we have exported to more than 30 countries such as America,,,,Columbia,,,,, etc.
Zhongshi Group is the API certification enterprise for 15 years
ISO9001 quality management system
We provide on-site technical service,no matter when and where.
Q
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 1-5days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance.
Tina Chen
E-maile



-
Step 1
Payment and order readiness
Minimum order: 100 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.