Product Description
The torque anchor uses separate slip and drag blocks to eliminate premature slip wear during installation. The drag blocks centralize the tool and provide the frictional interference to deploy the slips when torque is applied. The torque anchor centralizes the equipment in the casing and allows for better production through the slotted tag bar. It consists of body, slips, centralizer and spring strips. It can prevent tubing tripping during PCP working. It can be widely used because of adventures, such as simple structure, flexible rotation,safe and reliable anchoring and so on.
| Size | OD (mm) | Minimum Path (mm) | Overall length (mm) | Scope of work (mm) | Thread | |
| One side (EUE,NUE) | Another side (EUE,NUE) | |||||
| 51/2″ | Φ114 | Φ48 | 610 | 116-130 | 2-3/8" PIN 2-7/8"PIN 3-/12"PIN 4-1/2"PIN | 2-3/8"BOX 2-7/8"BOX 3-/12"BOX 4-1/2"BOX |
| 65/8″ | Φ137 | Φ60 | 610 | 140-156 | ||
| 7″ | Φ137 | Φ60 | 610 | 150-168 | ||
| 95/8″ | Φ190 | Φ98 | 711 | 208-232 |
Packing & Delivery



-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Premium · Estimated delivery: Sep 23–Oct 5 (22–34 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.