NB MOTOR High-quality Central Motor Include Accessories for Rolling Shutter Garage Door
Product details
| Product color | Orange |
| Name | central motor |
| Application | for rolling blind |
| Certificate | CE,TUV,CE ISO9001:2008,CCC |
| Lifting Force | 200KG |
| Power supply | 220V/AC 110V/AC 50/60Hz |
| Material | Copper Wire |
| Motor | AC Motor |
| Usage | Blind |
| Color | Request |
| Product Keywords | central motor suppliers, central motor shutter door control box, central motor screens |
ABOUT
Original reraod company is found since 2000 which is specialized tubular motor and side motor manufacturer.We are the top 2 domestic and international sales values.There are 3 die-casting machines and 6plastic high injection machines and 2 tube forming machines in a factory.We have 6 productions and 2 independent stator winding lines.Quality as our 1st and the most important mission,our motors have been exported,,,,,,,,,,,,,,etc.
1. 3 die-casting machines
2. 6 plastic-injection machines
3. 2 tube forming machines
High capacity
6 production lines totally
2500 tubular motors and 400 side motors to be completely finished every day
2 independent stator winding production lines
High standard
7 years warranty for 35,45 standard tubular motor
6 years warranty for 45,59 manual tubular motor
5 years warranty for 92 manual and other chain motor
3 years warranty for side motor
OEM &ODM
products have their own patents.All of product can be manufactured as customers' requirements like OEM&ODM
Professional service team
we following up all of products in the warranty time,your suggetions and feedback are highly appreciated
2. How long is the warranty time for motor?
6 years warranty for 45.59 manual tubular motor
5 years warranty for 92 manual and other chain tubular motor
3. How long is the delivery time?
Generally,20ft motors can be delivered from factory in one month
SAY HELLO!
568234192
scofield19910930
Victor Scofield
Shipping
INTERNATIONAL AIR MAIL




-
Step 1
Payment and order readiness
Minimum order: 10 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Economy · Approx. shipping fee: $ 32.31 for 10 pieces · Estimated delivery: Oct 1–Oct 24 (20–43 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.