High efficiency charcoal briquette making machine line
Description
Coal rod forming machine is a coal rod that converts powdered raw coal into different shaped bar shaped blocks. The working principle is very simple, which is that the electric motor transmits power to the gearbox through a triangular belt, and the output shaft of the gearbox transmits power to the propulsion shaft through a floating coupling. The thruster on the propulsion shaft pushes coal powder and other raw materials out through the forming cylinder mold head, producing an ideal high pressure coal rod
Advantages
1: The feeding spiral has a large lead, fast feeding, and a small lead for advancing the spiral, saving power.
2: The shaft seat is rigidly connected to the cylinder body, with high concentricity, resistance to reverse thrust, and machine stability.
3: The part that needs to be sealed adopts a fault structure, and dirt is leaked from the fault.
4: Triangle belt transmission, smooth operation, low noise, and its overload protection function
Parameter
| Model | MG MB-140 | MG MB-180 | MG MB-220 | MG MB-300 | MG MB-450 |
| Capacity | 1-2t/h(coal) 0.5-1t/h(charcoal) | 2-3t/h(coal) 1-2t/h(charcoal) | 3-4t/h(coal) 2-2.5t/h(Char co al) | 4-6t/h(coal) 2.5-3.5t/h(charcoal) | 8-12t/h(coal) 4-7t/h(charcoal) |
| Power | 11-15kw | 22kw | 30kw | 90kw | 220kw |
| Speed | 60rpm | 60rpm | 60rpm | 132rpm | 132rpm |
| Stick diameter | 6-55mm | 6-80mm | 6-90mm | 6-100mm | 10-120mm |
| Screw diameter | 140mm | 180mm | 200mm | 270mm | 420mm |
| Feeding size | <3mm | ||||
| Moisture | 12%-14% | ||||
| Voltage | 380V |
Charcoal briquette making machine line
Charcoal crusher
Charcoal briquettes machine
Cutter conveyor
Applicable raw materials
Final product
If any interest,Welcome to




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Ocean + Truck via Maersk · Approx. shipping fee: $ 480.40 for 1 piece · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.