Skip to Content

Browse

Certifications CE

High Recovery Rock Gold Leaching CIP Process Plant Factory

Available for enquiry 0.0 · 0 reviews
USD

25,340.00 25340.0 USD 25,340.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Type
Leaching Tank
Motor Type
AC Motor
Machinery test report
Provided
Core components
Engine
Warranty
1 Year
Video outgoing-inspection
Provided
Product description

Highlights at a glance

  • Gold CIL Plant (
  • Basic working principle of gold leaching CIL/CIP process The basic principle of the CIL/CIP process is to first grind gold ore and mix it with a cyanide solution, dissolving the gold into gold cyanide. Activated carbon is then used to adsorb the dissolved gold. In the CIL process, the carbon reacts with the ore slurry, while in the CIP process, the leachate is separated from the carbon and passed through a carbon tank to adsorb the gold. The adsorbed gold is then desorbed from the carbon through an elution process and ultimately extracted through electrolysis or other methods. This makes the CIL/CIP process highly efficient in gold recovery.
  • Certifications & compliance
    CE
    Complies with EU standards
    Frequently asked questions

    Our products have been sold to Southeast Asia, Africa, North America, Oceania, South America, Middle East and so on.

    We will supply the wear parts with factory price. You can buy them from our factory.

    18 months warranty for all kinds of products.

    Please send inquiry to us,leave your

    #1 Our senior engineer will supply installation and training service on-line or on-site. #2 We have engineer in Southeast Asia and Africa, we can supply 7*24 service.
    Description images
    Product detail
    Product detail
    Product detail
    Product detail
    CE
    Packaging and fulfilment
    • Step 1

      Payment and order readiness

      Minimum order: 1 Units

      Payment terms, specifications, and order details are confirmed before preparation begins.

    • Step 2

      Preparation

      31 days

    • Step 3

      Packaging and dispatch

      Packaging details are available on request.

      Final packing, freight, and delivery dates are confirmed before dispatch.

    Technical specifications
    Other details 23 fields
    Type
    Leaching Tank
    Motor Type
    AC Motor
    Machinery test report
    Provided
    Core components
    Engine
    Warranty
    1 Year
    Video outgoing-inspection
    Provided
    Production Capacity
    100
    Weight (kg)
    8888
    Place of origin
    China, Jiangxi
    Feeding size
    25mm
    Color
    As required
    Installation
    Technical Guidance
    Price
    Negotiable
    Power
    11 kW
    Name
    Gold Processing Plant
    Application
    Rock Gold Leaching CIP Process Plant for China
    Usage
    Gold Leaching
    Selling Units
    Single item
    Single package size
    1100X1100X1100 cm
    Single gross weight
    1100.0 kg
    Power (W) (Product option)
    100
    Model number
    HC-100
    Certifications & Compliance
    CE
    Lead time
    31 days
    Minimum order
    1 Units

    Customer reviews

    0.0 (0)

    No reviews yet

    Be the first customer to review this product.

    Write a review

    Up to 5 JPG, PNG or WebP images; 5 MB each.

    Request custom sourcing

    Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

    Best-match productsCompetitive quotesFast turnaround
    Request custom sourcing

    Upload your requirements

    Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

    XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
    XLSX
    Files are sent securely.