| item | Structural Beam carbon Steel H-Beams ASTM Hot Rolled Iron Carbon Steel HEA HEB H I-Beams with low price |
| Place of Origin | |
| Shandong | |
| Grade | Q235, S355jr |
| Technique | Hot Rolled |
| Thickness | 5-34mm |
| Application | Structural Beam |
| Length | 6-12m |
| Standard | ASTM |
| Flange Width | 100-408mm |
| Flange Thickness | 8mm - 64mm |
| Brand Name | Laigang |
| Model Number | European standards, American standards, Chinese standards |
| Tolerance | ±1% |
| Processing Service | Bending, Cutting |
| Alloy Or Not | Non-Alloy |
| Invoicing | by theoretical weight |
| Delivery Time | 31-45 days |
| Product name | Structural Beam carbon Steel H-Beams ASTM Hot Rolled Iron Carbon Steel HEA HEB H I-Beams with low price |
| Shape | H-channel |
| Standard | ASTM GB EN JIS |
| Material | Q235/Q345/ST37-2/ST52/Q420/Q460/S235JR/S275JR/S355JR |
| Technical | Hot Rolled Beam |
| MOQ | 1 Ton |
| Size | 100*100*6*8mm~900*300*18*34mm |
| Payment terms | 30%TT Advance + 70% Balance |
| Stock | 2000ton/month |
| Manufacturing Technique | Repeatedly |
Workshop
Our Workshop
Warehouse
Our Warehouse
Team
Our main products:steel pipe,seamless steel pipe,carbon steel pipe,welded steel pipe,alloy steel pipe,stainless steel pipe,steel plate,steel pipe mill roll moulds and some other products. We are very glad to establish a long-term business relationship with you on the basis of mutual benefit. If you are interested in any of our products, please feel free to
Q
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance,balance before shippment.



-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
7 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.