Production Name: MS galvanized steel pipe/ galvanized hollow section/ galvanized steel pipe price per kg
Steel Pipe Group Company
Brief introduction
Overview of our mill
Certificate
Production details
| Outer Diameter | Square pipe: 20*20mm~400*400mm Rectangular pipe: 20*40mm~300*500mm |
| Wall Thickness | Square and rectangular pipe: 0.8~20mm |
| Length | 3-12M according to client requirement |
| Standard | Hollow section: ASTM A500, EN10219, EN10210, JIS3466, GB/T 6728 |
| Material | Gr.A, Gr.B, Gr.C, S235, S275, S355, A36, SS400, Q195, Q235, Q345 |
| Certificate | ISO 9001:2008,SGS, BV, CCIC etc |
| Finish of pipe | Hot dipped galvanized with zinc 220~260g/m2; Pre-Galvanized with zinc 30~150g/m2 Painted with black/varnish lacquer; Oil on the surface to prevent rust; Bare pipe without painting |
| Pipe End | Plain end/ Bevel end; Groove end; Joint with flange; Threaded on two ends, one end with coupling, one end with plastic cap |
| Marking | As per client requirement or mill standard Painting method: Spray white paint |
| Packing | OD not less than 273mm: Loose packing,piece by piece. OD less than 273mm: In hexagonal seaworthy bundles packed by steel strips. small sizes nested into big sizes. |
| Applications | Construction / building materials steel pipe Steel structure Scaffolding pipe Fence post steel pipe Fire protection steel pipe Greenhouse steel pipe Low pressure liquid, water, gas, oil, line pipe Irrigation pipe Handrail pipe |
| Techinical | ERW (high - frequency welded) |
| Trade Term | FOB, CFR, CIF, EXW, FCA |
| Payment Term | T/T, LC |
| Delivery Time | 15-45 days (based on quantity) after receiving advanced payment by T/T or LC. |
| Main Market | Southeast Asia, South Asia, Middle East, Europe, Middle&South America, Africa and Oceania |
The detailed specification of Hot dipped galvanized hollow section
The detailed specification of Pre galvanized hollow section
| Square Hollow Section (SHS) | WT (mm) | Rectangular Hollow Section (RHS) | WT (mm) |
| 16*16 | 0.8-1.5 | 20*40 | 0.8-2.0 |
| 19*19 | 0.8-2.0 | 25*50 | 0.8-2.0 |
| 20*20 | 0.8-2.0 | 30*40 | 0.8-2.0 |
| 25*25 | 0.8-2.0 | 30*50 | 0.8-2.0 |
| 30*30 | 0.8-2.0 | 37*57 | 0.8-2.0 |
| 32*32 | 0.8-2.0 | 40*60 | 0.8-2.0 |
| 35*35 | 0.8-2.0 | 37*77 | 0.8-2.0 |
| 38*38 | 0.8-2.0 | 25*75 | 1.0-2.0 |
| 40*40 | 0.8-2.0 | 40*80 | 1.0-2.2 |
| 50*50 | 0.8-2.0 | 50*100 | 1.0-2.2 |
| 60*60 | 1.0-2.2 | 50*75 | 1.0-2.2 |
| 80*80 | 1.0-2.2 | 38*75 | 1.0-2.2 |
| 100*100 | 1.0-2.3 | 50*75 | 1.0-2.2 |
Pictures of our production
Strictly quality control
The other main production of
Who We are?
(1) Top 500 Enterprises Industry Leading Brands (2) 15 years experience in manufacturing and exporting steel products since 2000. (3) For 10 Consecutive Years of The First Production and Sales
What We own?
8000 employees. 59 ERW steel pipe production lines
36 hot-dipped galvanized steel pipe production lines
24 square and rectangular steel pipe production lines
18 SSAW steel pipe production lines 16 steel-plastic complex steel pipe production lines
9 hot-dipped galvanized square and rectangular steel pipe production lines
5 Seamless steel pipe production lines 3 national accredited laboratory 1 Tianjin government accredited business technology center
What is our yearly production capacity?
Over 1200,0000 Tons sales and production
1. Strong strength As the largest steel pipe manufacturer in Tianjin,, we give more support about the orders, customers will have more confidence to cooperate with our group
2. Quality guarantee group specialized in producing carbon steel pipes for many years, own experienced workers and advantage machine
3. Flexible terms Flexible clause not only to protect the benefit of supplier, but also the buyers
4. Delivery lead time To satisfied the urgency need of customers
5. Competitive price We offer better price based on the support of our whole group with l ow price and better quality
FAQ
1.Q






-
Step 1
Payment and order readiness
Minimum order: 3 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.