Skip to Content

Browse

JM 180m/h Diesel Cutter Suction Dredger Pump Engine Motor PLC Siemens Hydraulic Control System 315kw 2000m Discharge River

Available for enquiry 0.0 · 0 reviews
USD

164,470.00 164470.0 USD 164,470.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Type
Cutter Suction Dredger
Working Capacity
180m3/h
Power Type
Diesel
Core components
Motor, Engine, Pump
Warranty
1 Year
Machinery test report
Provided
Product description

Model

Digging depth

water flow

Discharge distance

Capacity

Power

6-26 inch

Max 25m

200-6000m 3 /h

Max 4000m

40-1200m 3 /h

122kw-3000kw

The engine or motor provides power,then the gearbox wil transit it to the sand pump,the sand pump is driven to rotate andcreat vacuum in suction pipe,in this way,the mixturecomposed of the mud,sand and water by the cutter head is sucked intothe sand pump through the inlet pipeline,and then discharged to appointed place through outlet pipeline which is connectedto the outlet of the sand pump.

When the dredger is being anchored,one of the two spuds at the stern and driven into the sand stratum,the left and right winches release and retrieve respectively,to make the dredger move around the spud,the ladder winch control ladder lift oidown,to realize the dredger operation. The dredger move ahead by two spuds alternately lifting or down.

200-6000m

3

/h

40-1200m

00:00

00:45

Q: Hello, may I ask how much each of your cutter suction dredgers costs?

A: Hello sir, the cutter suction dredger we produce is customized according to the situation of your construction site. You need to answer the following questions before I can give you an accurate price.

Q: What questions do you need to know?

A: 1.How many meters of depth do you need to excavate from the horizontal plane?

2.How many tons of solid material do you want to extract per hour?

3.How long pipe do you need to connect to discharge the material onto the shore?

4. Are you using it in the sea or in the river?

By answering the above questions, I can give you an accurate price

Q: Okay, you will get the answer. What is the production cycle of the cutter suction dredger?

A: Generally, it takes 50-90 working days, depending on the size of the model.

Packaging and fulfilment
  • Step 1

    Payment and order readiness

    Minimum order: 1 Units

    Payment terms, specifications, and order details are confirmed before preparation begins.

  • Step 2

    Preparation

    50 days

  • Step 3

    Packaging and dispatch

    Packaging details are available on request.

    Final packing, freight, and delivery dates are confirmed before dispatch.

Technical specifications
Other details 26 fields
Type
Cutter Suction Dredger
Working Capacity
180m3/h
Power Type
Diesel
Core components
Motor, Engine, Pump
Warranty
1 Year
Machinery test report
Provided
Video outgoing-inspection
Provided
Color
OEM
Dredging Depth
12 m
Draught
70 cm
Place of origin
China, Shandong
Weight
55000 KG
Dimension(L*W*H)
20mx4.2mx1.3m
Solid sand capacity
180m3/h
Discharge distance
2000m
Total power
315kw
Total fuel oil consumption
43L/h
Dredger LOA
28m
Discharge pipe Dia.
300mm
Head
60m
Cutter head Dia.
1000mm
Hydraulic control system
PLC Siemens
Selling Units
Single item
Single volume
0 cm3
Single gross weight
0.0 kg
Model number
10inch
Lead time
50 days
Minimum order
1 Units

Customer reviews

0.0 (0)

No reviews yet

Be the first customer to review this product.

Write a review

Up to 5 JPG, PNG or WebP images; 5 MB each.

Request custom sourcing

Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

Best-match productsCompetitive quotesFast turnaround
Request custom sourcing

Upload your requirements

Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
XLSX
Files are sent securely.