Skip to Content

Browse

Certifications CE

Factory Complete Gold Ore Processing Plant with Engine Energy Saving Rock Gold Mining Production Line

Available for enquiry 0.0 · 0 reviews
USD

40,080.00 40080.0 USD 40,080.00

Not Available For Sale

Minimum order quantity: 1 Units

Key attributes

View all
Type
Magnetic Separator, Separation of minerals
Voltage
standard
Core components
Bearing, PLC, Motor, Gear, Engine, Other
Machinery test report
Provided
Warranty
1 Year
Video outgoing-inspection
Provided
Product description

Highlights at a glance

  • What equipment is commonly required for mineral processing · During mineral processing, crushers such as jaw crushers and cone crushers, along with grinding mills (ball mills, rod mills), are typically used first to reduce the ore to an appropriate size. Different mineral processing equipment is then selected based on the specific process requirements.
  • How many common mineral processing techniques exist · Gravity separation commonly utilizes jigs, shaking tables, and spiral chutes. Magnetic separation primarily employs magnetic drums, magnetic separators and dry separators. Floating separation utilizes flotation machines and flotation columns of various models based on specific requirements. Cyanidation plants require equipment including leaching and electrolytic systems with agitation tanks and thickeners.
  • We offer the industry's most competitive pricing · All mineral processing equipment is designed and manufactured in our own factory, giving us an absolute advantage in pricing. Simply tell us your requirements, and we'll provide a complete
  • Mineral Processing Equipment for Sale · After crushing, you can choose our mineral processing equipment, which covers the entire process including grinding, classification, gravity separation, flotation, and dewatering. Each set undergoes rigorous quality control before leaving
  • Certifications & compliance
    CE
    Complies with EU standards
    Frequently asked questions

    We are a factory, established in 2008.

    Our products are manufactured in strict accordance with both national and international standards. We test each piece of equipment before delivery to ensure top quality.

    As a factory, we can offer you more competitive prices than the market rate. Our policy is to provide the lowest possible quotation to save time and maintain an absolutely honest business attitude. Discounts can be provided based on the order quantity.

    The delivery time is 7-10 days for items in stock and 15-30 days for mass production.

    We typically accept T/T, L/C, and Western Union payments.

    Yes, we can help you set up a complete production line and offer professional advice. We have experience in building numerous mining projects both and overseas.
    Description images
    Product detail
    Product detail
    Product detail
    Product detail
    CE
    Packaging and fulfilment
    • Step 1

      Payment and order readiness

      Minimum order: 1 Units

      Payment terms, specifications, and order details are confirmed before preparation begins.

    • Step 2

      Preparation

      30 days

    • Step 3

      Packaging and dispatch

      Packaging details are available on request.

      Final packing, freight, and delivery dates are confirmed before dispatch.

    Technical specifications
    Other details 20 fields
    Type
    Magnetic Separator, Separation of minerals
    Voltage
    standard
    Core components
    Bearing, PLC, Motor, Gear, Engine, Other
    Machinery test report
    Provided
    Warranty
    1 Year
    Video outgoing-inspection
    Provided
    Key selling points
    Long Service Life, Energy Saving
    Place of origin
    China, Henan
    Weight
    1000 kg
    Processed Materials
    etc, Copper Ore, Gold ore, Iron ore
    Name
    Flotation Mineral Processing Plant For Sale
    Usage
    Flotation Separator
    Application
    ect, Mining, quarry, Concrete mixing station
    Keywords1
    Gold Separation Equipment
    Selling Units
    Single item
    Single volume
    0 cm3
    Single gross weight
    0.0 kg
    Model number
    Gold Ore Processing Plant
    Power (W) (Product option)
    Standard
    Certifications & Compliance
    CE
    Lead time
    30 days
    Minimum order
    1 Units

    Customer reviews

    0.0 (0)

    No reviews yet

    Be the first customer to review this product.

    Write a review

    Up to 5 JPG, PNG or WebP images; 5 MB each.

    Request custom sourcing

    Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

    Best-match productsCompetitive quotesFast turnaround
    Request custom sourcing

    Upload your requirements

    Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

    XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
    XLSX
    Files are sent securely.