Steel has a history of more than ten years, it has a spacious workshop, advanced equipment technology and high quality staffing. At present, the company has several indoor warehouses with area of more than 10000 square meters and has all kinds of steel pipes all year long.
The company start to implement a comprehensive quality management system in 1997 and established it in 2001, in order to provide customers with high quality products and satisfactory service.
The company has passed most certification of quality management system, and the main products are all recognized by the international authoritative institutions. It has been specializing in production
and distribution of all kinds of steel pipes for a long time, widely used in petroleum, both and abroad chemical industry, boiler, coal, construction, pipe processing and other industries and fields, are exported to five continents in more than 20 countries and regions. Since its founding, it has also developed its own unique cultural concept.
At the same time, it takes excellence as its goal and is characterized by mature manufacturing and detection technology, high-quality service and thoughtful and smooth distribution, and gradually create brand, strive to serve the market, and establish long-term win-win relationship with customers.
Product Specification
| Steel plate/coil | Best products Q345C steel plate |
| Width(mm) | 600-25000mm |
| Wall Thickness(mm) | 0.2-400mm |
| Length(mm) | 600-12000mm |
| Standard | API5L, ASTM A106 Gr.B, ASTM A53 Gr.B, ASTMA179/A192/A213/A210/370WP91,WP11,WP22GB5310-2009,GB3087-2008,GB6479-2013,GB9948-2013, GB/T8163-2008, GB8162-2008,GB/T17396-2009 |
| Material | 20#, A53B, A106B, API 5L ST37.0,ST35.8,St37.2,St35.4/8,St42,St45,St52,St52.4 STP G38,STP G42,STPT42,STB42,STS42,STPT49,STS49 |
| Surface | Black painting, varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE |
| Certificates | API5L ISO 9001:2008 TUV SGS BV etc |
| Packaging | Loose package, Packaged in bundles(3Ton Max), bundled pipes with two slings at the both end for easy loading and discharging, End with Plastic caps or as per requirement |
| Application | 1. Fluid pipe 2. Power Plant 3. Structure pipe 4. High and low pressure Boiler tube 5. Seamless pipe /tube for petroleum cracking 6. Conduit pipe 7. Scaffolding pipe pharmaceutical andship,building etc. |
Shipping & Packaging
FAQ
1. What is your time of making a sample?
We will usually take 1~3 days to make the sample.
2. What is your delivery time?
For stocks, we can send the goods to loading port within 7 days after receiving your payment.
For production period, it usually needs about 15 days -30 days after receiving payment.
3. What is your shipping port?
Shanghai port, Ningbo port, Tianjin Port.
4. What is your payment terms?
It is usually 30% deposit by T/T in advance and balance before shipping.
5. What is your company locations?
Our office is located in Wuxi City, Jiangsu province. We have two indoor warehouses to ensure enough stock for different materials with sizes.




-
Step 1
Payment and order readiness
Minimum order: 5 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
10 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.