We are the leading company of magnesium production lines at home and abroad. In the year 2011. We signed an annual output of 100000 tons of magnesium metal project with the world iron and steel giant Korean Pohang iron POSCO company. We aslo have corporated with the magnesium companies in other countries.
S tep1: Calcined · The calcined dolomite granular
a.Process introduction: As a result of mining dolomite is too large in volume,So crushing and calcining bulk dolomite, make its become particles.
b.Main Products:Jaw Crusher,Conveyor,Vibrating screen,Vertical preheater,Rotary kiln,Vertical cooler,etc.
Step2:Grinding and balling · Raw material production and storage
a.Process introduction: Calcined dolomite, using a ball mill and other equipment to the grinding ball material, storage after production well.
b.The main equipment:Electronic batching scale,Bucket elevator, Ball mill, Screw conveyer,FU chain conveyor,etc.
Step3:Reduction treatment -Reduction treatment raw materials
a.Process introduction: Refine the raw materials, product the qualified products and sales.
b.List of equipment and processes:Reduction furnace,Wind machine Vacuum pump,Jet pump,etc.
Step4:Refine · produce a product
a.Process introduction:Use of a series of equipment, refine the raw material, create quality products and sales them.
b.The main equipments:Refining furnace,Electronic moisture device,Pouring pump,Continuous casting machine,etc.
Technical Parameter
| Model (m) | Basic Parameters(t/h) | Reducer | Electric Motor | Qty of Support (No.) | Equipment Weight(t) | |||
| Reloving Speed (r/min) | Slope(%) | Capacity (t/h) | Model | Model | Power(KW) | |||
| φ1.6×32m | 0.58-2.85 | 4 | 2 | ZQ75-50 | YCT250-4A | 18.5 | 3 | 46.8 |
| φ1.6/1.9×36m | 0.53-1.59 | 4 | 2.5-3 | ZQ110-7 | YCTZ50-4B | 22 | 3 | 57 |
| φ1.9×39m | 0.53-1.59 | 4 | 3-3.4 | ZQ125-7 | YCT315-4A | 37 | 3 | 71.79 |
| φ2.2×45m | 0.214-1.64 | 3.5 | 4-5 | Main ZS125-5 | YCT315-4B | 45 | 3 | 142.6 |
| Auxiliary:ZQ40-40 | Y112M-4 | 4 | ||||||
| φ2.5×50m | 0.62-1.5 | 3.5 | 5-6 | Main:ZS165-5 | YCT355-4A | 55 | 3 | 180 |
| Auxiliary:ZS50-1 | Y160M-6 | 7.5 | ||||||
| φ2.5×55m | 0.62-1.5 | 3.5 | 5-6 | Main: ZS165-5 | YCT355-4A | 55 | 3 | 185 |
| Auxiliary:ZS50-1 | Y160M-6 | 7.5 | ||||||
| φ2.8×55m | 0.62-1.5 | 3.5 | 6-7 | Main: ZS165-5 | YCT355-4B | 75 | 3 | 215.6 |
| Auxiliary:ZS50-1 | Y160L-6 | 11 | ||||||
| φ3.0×60m | 0.5-1.5 | 3.5 | 7-9 | Main:ZS165-3 | ZSN-280-11B | 125 | 4 | 310.9 |
| Auxiliary:ZS50-1 | Y160L-6 | 11 | ||||||
| φ3.2×64m | 0.4-1.5 | 3.5 | 8-10 | Main: ZS130-16 | ZSN-280-11B | 190 | 4 | 337.8 |
| Auxiliary:Zl50-1 | Y180L-4 | 22 | ||||||
| φ3.5×70m | 0.4-1.5 | 3.5 | 12-14 | Main: ZSY500-40 | ZSN-315-082 | 280 | 4 | 394.6 |
| Auxiliary:Zl50-14 | Y180L-4 | 22 | ||||||
| φ4.0×80m | 0.4-1.5 | 3.5 | 16-20 | Main: ZLY630-35.5 | ZSN-315-12 | 355 | 4 | 564.8 |
| Auxiliary: ZSY280-35.5 | Y200L-4 | 30 |
Our main products include: rotary kiln, rotary dryer, cooler, ball mill, preheater, conveyor, etc. and complete sets of machinery for cement
We can provide complete technology solutions and whole set production equipments for ceramic sand plant of capacity 10000-30000 tons per year. Our professional engineer can make the design according to project situation to save energy consumption by 35%. We provide considerate services to minimize clients' worries.
1. Assist clients to prepare for the first construction scheme
2. Install and debug the equipment
3. Train the first-line operators on site
4. Examine the equipment regularly
5. Take initiative to eliminate the troubles rapidly at site
6. Distribute the guarantee fittings door-to-door
7. Provide perfect service
8. Provide technical exchanging
9. Provide maintenance for big items.
Please tell me your demand information, so we can send you accurate quotation
♥ What's the raw materials you want to process(such as limestone, granite, basalt)?
♥ What is capacity you want tons per hour? such as 3-10TPH, 15TPH, 80 TPH.
♥ Your
Send Message or Chat Now for Detailed quotation!!!




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.