Process of crude oi plant
Remove water first in the first distillation tower Separate light oil in the second distillation tower Separate diesel and heavy oil in the third distillation tower Diesel and gasoline goes for filter system to remove more sulphur and catalyst particles End product collection
Main Feature
1) Continuous running
2) PLC control system,saving labor and more effeiciency
3) Tube furnace and Thermal oil furnace heating system.
4) With dust and sulfur removal system with no pollution
5) Sinopec technology process,the output diesel&petrol can reach national standard.
| Model | Capacity(T/D) | Power(Kw/h) | Catalyst(0.1% usage) | Labor |
| RK-CR20 | 20T | 60 | 3 | 1-2 per shift |
| RK-CR30 | 30T | 60 | 3 | 1-2 per shift |
| RK-CR50 | 50T | 80 | 3 | 1-2 per shift |
| RK-CR100 | 100T | 140 | 8 | 1-2 per shift |
| RK-CR200 | 200T | 250 | 20 | 1-2 per shift |
diesel oil: 60%-65% Gasoline oil: 20%-30% Heavy oil:10%-15% Waste gas:1%-2% Waste water: 5%
Energy consumption(Take 50T/D for example)
Power: 80KW/H Light oil:80kg*50*60% Water:800-1000kg per day Operation labors: 1-2 people per shift
Pre-Sales Service
* Inquiry and consulting support.
* Sample testing support.
* View
After-Sales Service
* Training how to instal the machine, training how to use the machine.
* Engineers available to service machinery overseas.
1,Do you support install and traning?
Yes,our engineer will go to you place to help install and guide.
2,Can you test our crude oil and do experiment for free?
Yes.If you want to do experiment about your raw material,you can deliver to us or bring some when come to visit.
3,How do you ensure you machine quality and working?
Our plant is with ASME welding standard,using Q345R boiler steel, reaches Europe standard.Our technology is corporated with Petrochemical design institute,the output diesel&petrol can reach national standard.
4,What's guarantee period?
The warranty period is 24 months. 5,Can I visit your factory and watch plants?
Yes.Welcome to visit




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
45 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.