| Product Name | Deformed Steel Rebar |
| Material | Q195, Q235, Q345; ASTM A53 GrA,GrB; STKM11,ST37,ST52, 16Mn,etc.or customer required |
| Size | 6mm,8mm,10mm, 12mm, 13mm, 14mm, 16mm, 20mm, 22mm, 25mm, 30mm, 32mm, 40mm,50mm,or customer required |
| Length | 5m-14m,6m,9m,10m-12m,12m or as customer's actual request |
| Standard&Grade | BS4449-2005,GB1449.2-2007,JIS G3112-2004, ASTM A615-A615M-04a |
| Grade A, Grade B, Grade C | |
| BS4449 460B 500B 500C | |
| Please consult sales for other standards | |
| Section Shape | Spiral Shape, Herringbone Shape, Crescent Shape |
| Packing | Bundle, or with all kinds of colors PVC or as your requirements |
| Ends | Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc. |
| Surface Treatment | 1. Black and color painting |
| 2. Transparent oil,anti-rust oil | |
| 3. According to clients requirement | |
| Delivery Time | Usually within 7 days, Arrange the delivery time according to the quantity |
| Application | Rebar is widely used in building, bridge, road and other civil engineering construction. From highway, railway, bridge, culvert, tunnel, flood control, dam and other public facilities, to the building foundation, beams, columns, walls, plates, screw steel are indispensable structural materials. |
A: We are a professional and famous factory. The main products of
A:Commonly two payment term for new customers
Q: How about the samples? Is it free or extra fees?
A: Usually, we would like to supply the samples before order. If the samples are in stock, it will be free. If the samples need to be produced, we will charge some reasonable cost. But this amount will be deducted from your first order invoice.
Q: How long is your delivery time?
A: Our daily inventory is more than 8000 tons, so common products size orders just need 5 days from stocks. If there are special size order, it will cost 7-15 days.





-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
35 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.