Skip to Content

Browse

Hot Dip Galvanized Steel Pipe Round Tube GI Pipe Pre Galvanized Carbon Steel Tube for Construction Scaffolding

Available for enquiry 0.0 · 0 reviews
USD

930.00 930.0 USD 930.00

Not Available For Sale

Minimum order quantity: 1 Units
  • Application
  • Standard
  • Alloy Or Not
  • Tolerance
  • Certificate
  • Special Pipe
  • Delivery Time
  • Invoicing
  • Place of origin
  • Outer Diameter (Specification)
  • Selling Units
  • Volume per batch
  • Gross weight per batch
  • Thickness
  • Length (Product option)

This combination is unavailable.

Key attributes

View all
Application
Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil Pipe, Chemical Fertilizer Pipe
Standard
AISI
Alloy Or Not
Non-Alloy
Tolerance
±1%
Certificate
CE, ISO 9001, API, BSI, BIS, SABS, SIRM, JIS, Gs
Special Pipe
Other
Product description

Highlights at a glance

  • Non-Alloy Material: Durability and cost-effectiveness for construction applications.
  • By Actual Weight Measurement: Precise and reliable material quantity.
  • ±1% Tolerance: High precision ensuring consistent quality.
  • Origin: Locally sourced for quick shipping and supply.
  • Fast Shipping: Typically delivered within 8-14 days.
  • Frequently asked questions

    Sure, we can send samples to all over the world. Our samples are free, butthe customer needs to bear the express delivery cost

    Yes, we promise to provide the highest quality products and deliver them ontime regardless of whether the price changes or not. Honesty is the tenet of ourcompany.

    Emails and faxes will be checked within 24 hours. Meanwhile

    If you need, samples will be provided free of charge, but the shipping cost willbe borne by our customer.
    Description images
    Product detail
    Packaging and fulfilment
    • Step 1

      Payment and order readiness

      Minimum order: 1 Units

      Payment terms, specifications, and order details are confirmed before preparation begins.

    • Step 2

      Preparation

      14 days

    • Step 3

      Packaging and dispatch

      Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days

      Final packing, freight, and delivery dates are confirmed before dispatch.

    Technical specifications
    Other details 15 fields
    Application
    Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, Oil Pipe, Chemical Fertilizer Pipe
    Standard
    AISI
    Alloy Or Not
    Non-Alloy
    Tolerance
    ±1%
    Certificate
    CE, ISO 9001, API, BSI, BIS, SABS, SIRM, JIS, Gs
    Special Pipe
    Other
    Delivery Time
    8 ~ 14 days
    Invoicing
    By Actual Weight
    Place of origin
    China, Shandong
    Outer Diameter (Specification)
    21 - 1020
    Selling Units
    Multiple of 1 items
    Volume per batch
    0 cm3
    Gross weight per batch
    0.0 kg
    Thickness
    0.1-30mm
    Length (Product option)
    6.4 m, 6 m, 12 m
    Lead time
    14 days
    Minimum order
    1 Units

    Customer reviews

    0.0 (0)

    No reviews yet

    Be the first customer to review this product.

    Write a review

    Up to 5 JPG, PNG or WebP images; 5 MB each.

    Request custom sourcing

    Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.

    Best-match productsCompetitive quotesFast turnaround
    Request custom sourcing

    Upload your requirements

    Upload your BOM, BOE, RFQ or requirement list and get one consolidated response.

    XLS, XLSX, CSV, PDF, DOC or images · Max 10MB each or drag and drop
    XLSX
    Files are sent securely.