Product details
Dry Air Drilling, Zero Water Demand for Arid Mining Zones Adopts pneumatic air lift circulation technology without mud mixing. Works normally in desert, mountainous and water-short mining areas (Africa, Central Asia, ). No large water tank or water supply support required, non-stop mining exploration all year round.
Superior Hard Rock Drilling Capacity for Complex Mine Strata Optimized high air pressure circulation system easily breaks granite, fractured rock, hard ore layers and inclined mineral veins. Effectively prevents sticking and hole collapse, stable continuous drilling for tough mining terrain.
30%-50% Higher Drilling Efficiency, Shorten Mine Exploration Cycle Fast air slag discharge without waiting for mud solidification. Max daily drilling depth reaches 200-300m, greatly accelerates mine general survey & detailed exploration, helps mining enterprises put mineral development into production faster.
Heavy-Duty Reinforced Structure, Low Failure Rate for Long-Time Mine Operation Thickened main frame, strengthened rotary power head and wear-resistant drill string components. Designed for 24h continuous harsh field mining work. Universal spare parts, simple on-site maintenance to cut downtime loss.
Multi-Mineral Universal Design, One Rig for All Solid Mineral Exploration Suitable for gold, lithium, copper, cobalt, iron, nickel, bauxite, limestone and other solid mineral prospecting, geological grade control and blasting hole drilling, maximize equipment utilization rate for mining contractors.
15+ Years Professional Drilling Rig R&D & Production Factory We are a specialized manufacturing plant integrating design, production and after-sales service, focusing on RC air lift drilling equipment for mining exploration. All core components are self-produced with strict production quality control.
Full Certifications for Global Customs Clearance All rigs support CE, ISO9001


-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
5 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.