1.What Payment terms do you offer for international customer? T/Tpaypal, west union or othersproduct: 50%6 deposit before production, 50%o before shipmentFor mould: full amount before production
2.What is your annual production capability? 8 Millions-10 Millions US Sz
3.how many Die casting machines do you have? 250 tons aluminum alloy die casting machine( ZITAL): 1 set 420 tons aluminum alloy die casting machine( ZITAI): 1 set 500 tons aluminum alloy die casting machine( ZITAL): 1 set t650 tons aluminum alloy die casting machine( ZITAI): 1 set 800 tons aluminum alloy die casting machine(UBE: 2 sets 1250 tons aluminum alloy die casting machine(TOSHIBA ): 1 sett 1600 tons aluminum alloy die casting machine(MULER): 1 set 1650 tons aluminum alloy die casting machine(UBE ): 1 set Three Dimension Measurement MachineAuxilary equipment: Drilling machine, tapping machine,polishing machine and etc.
4.what is normal lead time? Sample Lead time: 3-7 working days(Without mouldMass Production: 30 days, It depend on the Qty and the structure) 5.sample pictures of diffrent materials machining See our showroom for your reference
6.surface treatment? Ordinary anodic oxidation, hard anodic oxidation, rodin, chromate,Surtec, Buffering, Sand Blasting, PowderCoating, Painting, Hard Anodizing, Brushingelectrophoresis, sprayingelectroplating, etching, laser, blacpassivation, pickling, QPQ, heat treatment, medium frequency, highfrequency, nitride, carburizing, tempering, phosphating, magneticforce grinding, ultrasonic cleaning
7.what is your quality process? New drawings analysis-the internal production control conversion-drawingprocess flow chart-frst manufacturing inspection-modifed withnumerical optimization-normal production-qc inspection record-surfacetreatment- FQC inspection report and record-packaging logistics
8.Do you measure details and attach measure protocol with delivery? Inspection report, material certificate, packing list and material detailsof label attached in the package




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Air + Express via FLY Logistics · Approx. shipping fee: $ 8.00 for 1 piece · Transit time: Est. 8-9 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.