Product details
Glassfiber Material: Provides durability and excellent filtration efficiency for prolonged use.
Customizable Filtration Range: Adjustable between 1-100 micron for precise filtration needs.
Manufacturer: Sourced from trusted Chinese supplier ensuring quality and reliability.
Construction machinery air filter, OEM replacement Construction machinery oil filter, high-efficiency filtration Construction machinery diesel filter
oil-water separation Construction machinery hydraulic oil filter, return oil filter Construction machinery pilot filter
precision filtration Coarse & fine fuel filter for construction machinery Transmission filter for construction machinery
Construction machinery filter element for excavator Special filter element for loader, construction machinery Full-range filter elements for bulldozer
construction machinery Oil filter for road roller, construction machinery Diesel filter for grader, construction machinery Hydraulic filter for crane
construction machinery equipment Air filter for mixer truck, special for construction machinery
nstruction Machinery: Excavators, loaders, road rollers, cranes, pump trucks, etc.
2.Mining & Metallurgy: Shearers, crushers, steel rolling equipment, mining hydraulic stations
dustrial Equipment: Machine tools, injection molding machines, hydraulic presses, various hydraulic pump stations
4.Agricultural & Forestry Machinery: Tractors, harvesters, forestry operation equipment
5.Port, Marine & Shipping: Port cranes, ship steering gears, ship anchors, handling equipment
6.Energy & Power: Wind turbine units, hydraulic systems for hydropower/thermal power plants, oilfield equipment
7.Special Vehicles: Sanitation vehicles, aerial work platforms, fire trucks, rail vehicles
FS19931 BF1345 BF1345-O P550548 P550729 P551033 P551034 LFF3579 33232 33411 1618385C91 1618385C91
1677004C91 3232 3411 86232 86411 A-95232 A-95411 ABPN10GFS19547 F65120 FF1041 FS246 PFF830 PS7170
PS8186 R43 TP1280
-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Economy · Estimated delivery: Oct 3–Nov 11 (31–70 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.