Product details
Oil Filter Lubricating Oil Impurity Removal: Effectively removes impurities from lubricating oil for optimal engine performance.
Glassfiber Material: Provides durability and excellent filtration efficiency for prolonged use.
Customizable Filtration Range: Adjustable between 1-100 micron for precise filtration needs.
Manufacturer: Sourced from trusted Chinese supplier ensuring quality and reliability.
nstruction Machinery: Excavators, loaders, road rollers, cranes, pump trucks, etc.
2.Mining & Metallurgy: Shearers, crushers, steel rolling equipment, mining hydraulic stations
dustrial Equipment: Machine tools, injection molding machines, hydraulic presses, various hydraulic pump stations
4.Agricultural & Forestry Machinery: Tractors, harvesters, forestry operation equipment
5.Port, Marine & Shipping: Port cranes, ship steering gears, ship anchors, handling equipment
6.Energy & Power: Wind turbine units, hydraulic systems for hydropower/thermal power plants, oilfield equipment
7.Special Vehicles: Sanitation vehicles, aerial work platforms, fire trucks, rail vehicles
P551425 BF7677-D BF7898-D BF7951-D FS19793 FS19827 FS19971 FS19974 FS19982 FS19992 FS19993 SN70133
SN70241 H277WK RE67901 L3441F L8680F WK8114 WK8119 WK8124 WK8139 WK8163 WK8164 QF400188 RF1108
RF1152 SK3305 ST20123 ST22132 ST22139 CS0119M CS0144M 31877 37299 33132 33586 33633 33658 33659
33756 33808 33809 V836867595 2854796 2855755 2855756 5181823 47335715 87803440 87803441 87840590
L87801285 1454501 2230702 350055 32925869 32925994 FS550435 FS550754 4224701M1 V836862602 V836867595
SP4065 BF1255 BF7677 BF7953D 87802921 87803442 877802921 162000080877 1620000080921 4275626M1 86132
6005028152 86586 86633 86756 FSR819525 FSR819619 4437885 2C119176BA YC159176AB FS19525 FS19619 32808
BF7898D FF1179D RE53727 FS251 FS252 210130700 26560139 26560141 F66004 SK3305 SK3495 836866577 33317
836867595 SFF7677 P550754 P550435 504107584 WGFS2925 WGFS1925 20366577 836862602 SFF7677 38332
-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Economy · Estimated delivery: Oct 3–Nov 11 (32–71 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.