This small wheat flour milling line includes a flour machine, a wheat washing machine, and a grain cleaning machine
Working Method: The general working flow chart is:Clean wheat feed -seperating-scouring -seprating-grinding -layout. Compared to the wheat milling plant with dozens of seprated miilers and clean machines,this machine is much simpler both on the use and treating process,But users still can get the good qualtiy flour and the bran in end at a small scale,lower power consumption and easy operation.
1. If customers need to clean the wheat, the cleaning machine could be provided together with the machine,including the dry cleaning type and water cleaing type. 2. And the main spare parts of the machine are rollers, need to check the roller after a period.As it would affect the flour quality in the end.Also replacing the rollers are easy and simple. 3. And the 5-500 tons/day wheat milling machine could be supplied, for the home &individual use.
| Equipment Name | |
| Iutput | 10T per day |
| Main Cleaning Equipment | 1. Combined wheat cleaning machine |
| 2. Wheat washing and dry machine | |
| Milling Equipment | 1.Roller Mill |
| 2. sieves | |
| 3. High pressure fan | |
| Products and extraction rate(%) | wheat flour ≥75%, Wheat bran ≤25% |
| Power | 29kw |
| Size of workshop | L*W*H: 7*4*3.5m |
After-Sales Service
A
Q2: How can I get to your company?
A: You can get a flight to Zhengzhou Xinzheng International Airport,or you can go here by train to Zhengzhou Railway Station/Zhengzhou East Railway Station
Q3.What's the Payment?
A:We accept T/T, Western Union
Q4: Will you send engineers to install the plant?
A:we send engineers to your place for guiding installation. Engineers are responsible for guide installation, test running and training.
Q5: Can you show how the machine works?
A: Certainly, we will send you the Operating video & instruction to you together with machines, to help you use the machines better.





-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
12 days
-
Step 3
Packaging and dispatch
Ocean freight via Maersk · Approx. shipping fee: $ 0.84 for 1 unit · Transit time: Est. 17-24 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.