Multi-rollers Cotton waste yarn opening machine chemical fiber tearing machine Textile wastes tearing machine fiber fluffe r
Features
1.easy operate 2.high efficiency 3.reliable performance 4.high output
Main functions
Process fiber, cotton, ramie kind rag, to make it be similar to flocculent.
The usage of end products
Used for spinning yarn
Used for filling duvet, sofa, pillow, toy, etc
Used for making felt
Used for making carpet for cars
Parameters
| Model | Dimension mm | Roller quantity | roller’s diameter mm | Motor kw | Length of Roller mm | Capacity kg/h | Weight kg |
| 250A | 2000×1700×1300 | 1 | 250 | 5.5 | 1000 | 80-120 | 800 |
| 250B | 2900×1700×1300 | 2 | 250 | 29 | 1000 | 150-200 | 1500 |
| 250C | 4000×1700×1300 | 3 | 250 | 34 | 1000 | 200-250 | 2350 |
| 250D | 5100×1700×1300 | 4 | 250 | 40 | 1000 | 250-300 | 3200 |
| 250E | 6200×1700×1300 | 5 | 250 | 45.5 | 1000 | 250-300 | 4050 |
1. About the machine and service?
If you have any problems after receiving the machine or during use (machine installation, use method, replacement parts, how to maintain, precautions, etc.), please feel free to contact me, we will provide the best solution. 24 hours online service to solve any problem. Your satisfy is our pursuit. Sincerely hope our cooperation.
2. If we have problems when using this machine, what should we do?
If you have any problem, just
3. Does your company accept customization?
We have excellent design team,and we can accept OEM.
4. How to identify 304 stainless steel and 201 stainless steel?
Once you buy our machine, we will give you a stainless steel identification solution to meet your requirements.
5. Can you guarantee your quality?
Of course. We are the manufacture factory. More important, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely.




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.