Forplus black panther series high pressure pump
Forplus black panther series high pressure pump
Model
Forplus-D30K
Forplus-D40K
Forplus-D50K
Forplus-D50K Plus
Rated pressure
30000psi(200MPa)
40000psi(260MPa)
50000psi(300MPa)
55000psi(350MPa)
Rated flow
0.96L/min
1.3L/min
1.5L/min
1.84L/min
Rated power
4KW
5.5KW
7.5KW
11KW
Max gem orifice
0.2mm
0.22mm
0.24mm
Inlet water pressure
2-6bar
Water inlet caliber
Φ12mm
Inlet water flow
6-8L/min
Voltage
single phase 220V 50HZ
Name
1520 cutting platform
X*Y*Z Stroke
1500*2000*150mm
voltage,rated power
220v,50HZ
core components
PLC, Engine, Bearing, Gearbox, motor, Pressure vessel, Gear, Pump, auto abrasive feeding system(selective)
Product Paramenters
Glass cutting applying by D50k plus pump and standard cutting machine
D50K Plus high pressure pump matched with 3-AXIS CNC standard cutting machine is well working in Glass cutting.
we can also choose to use 5-axis cutting head.
Product advantages
1.
low energy consumption and high performance
.220V AC power supply, power 3.5KW-11KW,max pressure 350Mpa,Max flow 3L/min,fit for most waterjet cutting sceranios.
2.
Simple Connection.
Tap-water quick plug,plug and play,no need filtering or cooling.
3.
Contain embedded passivation water treatment system
no need extra water purification equipment.
4.
Adopt same automotive chassis electrophores process for the shell
wear resistance and corrosion resistance without rust.
5.
Portable function can be added
.Wheels and handles.
6.
Three sets of cutting mechanisms can be added flexibly
.linear cutting/circular cutting/handheld gun.
220V AC power supply, power 3.5KW-11KW, max pressure 350Mpa,Max flow 3L/min, fit for most waterjet cutting sceranios.
Contain embedded passivation water treatment system,no need extra water purification equipment.
Adopt same automotive chassis electrophores process and spray-painting for the shell,wear resistance and corrosion resistance
without rust.

-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Economy · Approx. shipping fee: $ 649.40 for 1 piece · Estimated delivery: Sep 8–Oct 13 (8–43 days)
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.