Remote Control Rc SE210 Excavator 20.5ton 1cbm Excavator
* The paralleling radiator is adopted to effectively prevent the overheating. The exhaust system is optimized based on the Fluent simulation to reduce the exhaust noise and improve the engine
power utilization effciency. The transmission route is optimized based on the MATLAB vibration system simulation principle so that the noise level of the machine is superior to CE standard
requirement. The three-stage integrate fuel filter and the electric fuel pump guarantee the good fuel adaptability and effectively protect the engine.
* Product reliability: The high quality core parts and the design optimized working device feature stable and reliable quality.
* Operations and maintenances: The large color display can real-time monitor the working status of machine mode and incorporates the malfunction self-diagnosis and record function.
The multi-stage power control is adopted for the manual and electronic accelerators so that the user can select different working modes depending on own needs. The diversified optional
attachments, including breaking hammer, ripper, and quick change device, can be equipped to realize the digging, landfill, breaking,and leveling operations, featuring multi-function capability.
The remote installation locations for the maintenance parts ease the maintenance operations.
* Comfort: Within the spacious cab, the arrangement and color matching of the upholstery are designed as per the ergonomic principle. The full-automatic A/C system, automatic air vent
adjustment and distribution, and height and position adjustable seats feature excellent adaptability. The cab is equipped with composite shock absorbers to effectively mitigate the vibration of
the cab.
My
| ENGINE | Model | B5.9-C |
| Type | Water cooling, in-line,6 cylinders, turbocharging | |
| Quantity of cylinders | 6 | |
| Bore x stroke | 102 x 120 mm | |
| Displacement | 5.9 L | |
| Power output | 112 kW/1950 rpm | |
| Maximum torque | 614N.m | |
| HYDRAULIC SYSTEM | Pump | Imported |
| Type | Variable piston pump | |
| Maximum discharge flow | 2x218 L/min | |
| Control circuit | 3.9 MPa | |
| Travel circuit | 31.9 MPa | |
| Swing circuit | 25.5 MPa | |
| TRAVEL SYSTEM | Travel motor | Variable axial piston motor |
| Travel brakes | Lubricated double-disc | |
| Parking brake | Pressure release | |
| Travel shoes | 2 x 47 | |
| Travel speed | 3.3/5.1 km/h | |
| Drawbar pulling force | 195 kN | |
| Gradeability | 70% | |
| Minimum ground clearance | 470 mm | |
| OIL CAPACITY | Fuel tank | 330 L |
| Cooling system | 28 L | |
| Engine oil | 20 L | |
| Hydraulic oil tank | 400 L | |
| System capacity | ||
| SWING SYSTEM | Brake | Pressure Release Mechanical Braking |
| Swing speed | 11.5 rpm | |
| Tail swing radius | 2925 mm | |
| Arm digging force | 92.5 KN | |
| Bucket digging force | 127 KN | |
| BUCKET | Bucket capacity | Backhoe bucket 1.05 m3 (SAE) |
| Number of bucket teeth | 5 | |
| Bucket width | 1267 mm | |
| Arm length | 2.925 m | |
| Maximum digging reach/Maximum digging reach at ground level | 9.86 m/9.675 m | |
| Maximum digging depth/height | 6.49 m/10.095 m | |
| Maximum dumping height | 7.19 m | |
| Minimum swing radius | 2.97 m |




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
16 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.