Mining Equipment Small Scale Gold Mining Machinery, Gravel Gold Ore Grinding Wet Pan Milling, Gold Ore Grinding Wet Pan Mill
The Introduction of wet pan mill
Working Principle of wet pan mill
1.Less investment.
2.Easy to operation and maintenance.
3.High efficiency and saving power.
can take the place of ball mill because all the materials that ball mill can handle, the wet mill machine can handle as well.
5.Wet pan mill is the ideal equipment for small and medium enterprises that are in the field of ore dressing.
| Model | Specification | Input size(mm) | Rotate Speed (r/min) | Powder(kw) | Weight(t) |
| 1600A | 1600×400×200×500±20mm | 30mm | 20-22 | 25KW | 14.5 |
| 1500A | 1500×350×200×460±20mm | 20-22 | 22KW | 13.5 | |
| 1500B | 1500×350×150×460±20mm | 20-22 | 22KW | 12.3 | |
| 1500C | 1500×300×150×420±20mm | 20-22 | 22KW | 11.3 | |
| 1400A | 1400×250×150×350±20mm | 16-18 | 18.5kw | 8.5 | |
| 1400B | 1400×250×150×350±20mm | 21-23 | 18.5kw | 8.5 | |
| 1350A | 1350×250×150×350±20mm | 16-18 | 18.5kw | 8 | |
| 1350B | 1350×250×150×350±20mm | 21-23 | 18.5kw | 8 | |
| 1300A | 1300×250×150×350±20mm | 16-18 | 15kw | 7.5 | |
| 1300B | 1300×250×150×350±20mm | 21-23 | 15kw | 7.5 | |
| 1200A | 1200×200×80×250±20mm | 17-19 | 7.5kw | 5.5 | |
| 1200B | 1200×200×80×250±20mm | 23-25 | 7.5kw | 5.5 | |
| 1100A | 1100×200×80×250±20mm | 17-19 | 7.5kw | 5 | |
| 1100B | 1100×200×80×250±20mm | 23-25 | 7.5kw | 5 | |
| 1000 | 1000×200×80×250±20mm | 13-15 | 5.5kw | 4.5 |
6 Types of Gold Ore
Flow chart of gold ore processing
1. Are you manufacture or trading company?
We are factory, established in 2003.
2. How long is your delivery time?
7-10 days for the stock, 15-30 days for the mass production.
3. What is your payment method?
30% deposit in T/T advance, 70% balance before shipment.
4. How long is the warranty? Does your company supply the spare parts?
One year. Spare parts for you at lowest cost.
5. If I need the complete crushing plant can you help us to build it?
Yes, we can help you set up a complete




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.