| item | value |
| Place of Origin | |
| Warranty | 1 Year |
| Weight (KG) | 8 |
| Video outgoing-inspection | Provided |
| Machinery Test Report | Provided |
1.Enhanced Safety: The 7-5/8" Oilfield Drill Pipe Stabbing-Guides are designed for 2 3/8"-20" casing with thread protectors, ensuring a safer drilling process.
2.Durable Materials: Made of high-quality rubber or polyurethane, these guides are built to withstand harsh oilfield conditions, providing reliable protection for your drill pipe.
3.ISO Standards: Compliant with ISO standards, the product guarantees a consistent level of quality and performance, ensuring peace of mind for users.
4.Wide Range: A versatile tool for various drilling operations, the Stabbing-Guides are compatible with a wide range of drilling tools and well drilling applications.
prehensive Support: YCPT offers a 1-year warranty, along with video outgoing-inspection and machinery test reports, providing users with the assurance of a trusted product and supportive manufacturer.
1. who are we? We are based in Shandong,, start from 2014,sell to South America(30.00%),Mid East(30.00%),Africa(10.00%),Southeast Asia(10.00%),North America(10.00%),Central America(5.00%),Eastern Europe(5.00%). There are total about - people in our office. 2. how can we guarantee quality? Always a pre-production sample before mass production; Always final Inspection before shipment; 3.what can you buy from us? cementing tools,drilling tools,API pipes,Mining equipment,petroleum equipment 4. why should you buy from us not from other suppliers? We are a professional equipment company on research, design, productionand sales. We are a first class authorized company of Sinopec, and member ofCCPIT and CCOIC.We havestrong technical force, advanced processing equipment, and engage in technicalexchang 5. what services can we provide? Accepted Delivery Terms: -; Accepted Payment Currency: -; Accepted Payment Type: -; Language Spoken




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
15 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.