JCD1000S Crawler Diamond Core Drilling Rig
| Specification | Unit | JCD1000S |
| Drilling Capacity | ||
| Drill Diameter | HTW-NTW-BTW | |
| Drill Depth | m | 500-1100-1400 |
| Hydraulic System | ||
| Rated Pressure | MPA | 28 |
| Rated Flow | L/min | 300 |
| Heat Dissipation | Air Cooling | |
| Engine | ||
| Brand | YUCHAI | |
| Type | Turbocharger | |
| Rated Speed | RPM | 2400 |
| Rated Power | kW | 118 |
| Drilling System | ||
| Torque | N.M. | 1000-3500 |
| Speed | RPM | 1300 |
| Tower Type | One-piece Ground-touching | |
| Feeding Stroke | mm | 3500 |
| Drilling Angle | ° | 45-90 |
| Max. Pull Up Capacity | Ton | 28 |
| Max. Push Down Capacity | Ton | 14 |
| Rope Hoist | ||
| Lifting Capacity | kg | 1000 |
| Speed | RPM | 100-300 |
| Wire Rope Diameter | mm | 6 |
| Rope Capacity | m | 1100 |
| Walking System | ||
| Operation Type | Manual & Remote Control | |
| Walking Speed | KM/H | 3.5 |
| Climbing Angle | ° | 40 |
| Mud Pump | ||
| Model | BW-150 | |
| Flow | L/MIN | 0-150 |
| Pressure | MPA | 0-7 |
| Hydraulic Generator | ||
| Type | Variable Frequency Brushless, Maintenance-Free | |
| Power | kW | 11 |
| Voltage | V | 220/380 |
| Weight & Dimensions | ||
| Transport Size | mm | 6000*2100*2400 |
| Weight | Ton | 8.5 |
A: Yes. JCDRILL is a leading and certified manufacturer of drilling machinery. We provide a comprehensive range of products to meet your diverse project requirements.
A: We accept both T/T and L/C payment terms. For T/T: 30% deposit in advance, with the remaining 70% payable before shipment. For L/C: We accept 100% irrevocable L/C without soft clauses.
A: As an experienced international supplier, JCDRILL supports all Incoterms 2010. Our most commonly used terms include FOB, CIF, CFR, and CIP.
A: Delivery time depends on the product type: Mud pump products: approximately 3–15 days for production Standard machines: typically available for delivery within 15 days In many cases, we can arrange immediate shipment for in-stock equipment.
A: We offer 24/7 year-round customer support, including holidays. Our service commitment: Response within 15 minutes Issue resolution within 24 hours
A: We operate global spare parts centers stocked with specialized components. Standard delivery: within 72 hours Maximum delivery time: within 1 week




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
45 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.