ZK Brand Energy Saving Rotary Kiln Equipment for Limestone Quick Lime
Brief Introduction
Lime Kiln is the ideal equipment to produce quicklime by the calcination of limestone (calcium carbonate). We could provide technological solutions and complete production equipment for 50-800TPD quicklime (active lime)
Working Principle
The kiln is a cylindrical vessel, inclined slightly to the horizontal, which is rotated slowly about its axis. The material to be processed is fed into the upper end of the cylinder. As the kiln rotates, material gradually moves down towards the lower end, and mayundergo a certain amount of stirring and mixing. Hot gases pass along the kiln, sometimes in the same direction as the process material (co-current), but usually in the opposite direction (counter-current).
1. ZK lime rotary kiln can work with vertical preheater and vertical cooler to achieve the advantages like high use ratio of raw materials, complete calcination, even quality, good quality lime, high capacity output, environmental and energy saving, simple operation and longer working life.
2. ZK lime vertical kiln was manufactured by ZK group with modern new technology, which is an environment protection, save energy, higher machanization and automaticity, quite modern lime kiln. Due to has low energy consumption, less cover area, less investment, wide applicability fuel, and more advantages.
| No. | Model | Capacity (t/h) | Revolving speed(RPM) | Support | Power (KW) | Weight (t) | Remark |
| 1 | Φ1.6×32m | 2 | 0.58-2.85 | 3 | 18.5 | 46.8 | |
| 2 | Φ1.6/1.9×36m | 2.5-3 | 0.53-1.59 | 3 | 22 | 57 | |
| 3 | Φ1.9×39m | 3-3.4 | 0.53-1.59 | 3 | 37 | 71.79 | |
| 4 | Φ2.2×45m | 4-5 | 0.214-1.64 | 3 | 45 | 142.6 | |
| 4 | |||||||
| 5 | Φ2.5×40m | 6.3 | 0.62-1.5 | 3 | 55 | 160 | preheater kiln |
| 7.5 | |||||||
| 6 | Φ2.5×50m | 5-6 | 0.62-1.5 | 3 | 55 | 175 | |
| 7.5 | |||||||
| 7 | Φ2.5×55m | 5-6 | 0.62-1.5 | 3 | 55 | 180 | |
| 7.5 | |||||||
| 8 | Φ2.7×42m | 13 | 0.6-2.3 | 3 | 55 | 190 | preheater kiln |
| 11 | |||||||
| 9 | Φ2.7×44m | 13 | 0.74-2.21 | 3 | 55 | 193 | preheater kiln |
| 11 | |||||||
| 10 | Φ2.8×42m | 14 | 0.5-2.503 | 3 | 55 | 195 | preheater kiln |
| 7.5 | |||||||
| 11 | Φ2.8×43m | 8.3 | 0.62-1.5 | 3 | 75 | 198 | preheater kiln |
| 11 | |||||||
| 12 | Φ2.8×55m | 6-7 | 0.62-1.5 | 3 | 75 | 215.6 | |
| 11 | |||||||
| 13 | Φ3×48m | 700 | 0.67-3.76 | 3 | 110 | 251 | decompose outside |
| 18.5 | |||||||
| 14 | Φ3.0×50m | 9.2 | 0.5-1.5 | 3 | 125 | 255 | preheater kiln |
| 11 | |||||||
| 15 | Φ3×60m | 7-9 | 0.5-1.5 | 3 | 125 | 270 | |
| 11 | |||||||
| 16 | Φ3×88m | 12.5 | 0.444-1.345 | 5 | 110 | wet kiln | |
| 11 | |||||||
| 17 | Φ3×100m | 11-13.5 | 0.47-1.48 | 5 | 90 | wet kiln | |
| 11 | |||||||
| 18 | Φ3.2×48m | 0.788-3.88 | 3 | 125 | |||
| 11 | |||||||
| 19 | Φ3.2×50m | 12.5 | 0.4-1.5 | 3 | 125 | preheater kiln | |
| 22 | |||||||
| 20 | Φ3.2×50m | 12.5 | 0.788-3.938 | 3 | 160 | decompose outside | |
| 15 | |||||||
| 21 | Φ3.2×64m | 8-10 | 0.4-1.5 | 4 | 190 | 337.8 | |
| 22 | |||||||
| 22 | Φ3.2×118m | 17 | 0.292-1.459 | 6 | 110 | wet kiln | |
| 11 | |||||||
| 23 | Φ3.3×50m | 13 | 0.36-3.57 | 3 | 160 | decompose outside | |
| 11 | |||||||
| 24 | Φ3.3×50m | 13 | 0.36-3.57 | 3 | 160 | 288 | preheater kiln |
| 11 | |||||||
| 25 | Φ3.3×52m | 13 | 0.67-3.43 | 3 | 160 | 290 | decompose outside |
| 11 | |||||||
| 26 | Φ3.3×54m | 14 | 0.92-2.74 | 3 | 125 | 292 | preheater kiln |
| 11 | |||||||
| 27 | Φ3.5×54m | 14 | 0.55-3.5 | 3 | 220 | decompose outside | |
| 18.5 | |||||||
| 28 | Φ3.5/3×60m | 14-16 | 0.39-1.95 | 4 | 110 | hollow waste heat | |
| 11 | |||||||
| 29 | Φ3.5×70m | 12-14 | 0.4-1.5 | 4 | 280 | 394.6 | |
| 22 | |||||||
| 30 | Φ3.5×125m | 21.8 | 0.281-1.406 | 5 | 2×90 | wet double drive | |
| 2×11 | |||||||
| 31 | Φ3.5×130m | 22 | 0.439-1.379 | 5 | 2×90 | wet double drive | |
| 2×5.5 | |||||||
| 32 | Φ3.5×145m | 25 | 0.345-1.379 | 6 | 2×90 | wet double drive | |
| 2×5.5 | |||||||
| 33 | Φ3.6×55m | 16.7 | 0.4-1.5 | 3 | 250 | preheater kiln | |
| 22 | |||||||
| 34 | Φ3.6×74m | 20.5 | 0.222-1.666 | 4 | 132 | hollow waste heat | |
| 11 | |||||||
| 35 | Φ3.8×58m | 20.8 | 0.4-1.5 | 3 | 250 | preheater kiln | |
| 22 | |||||||
| 36 | Φ3.95×56m | 0.6-3.3 | 3 | 250 | decompose outside | ||
| 15 | |||||||
| 37 | Φ4.0×60m | 25 | 0.4-1.5 | 3 | 315 | 470 | preheater kiln |
| 30 | |||||||
| 38 | Φ4×60m | 25 | 0.58-3.459 | 3 | 250 | 470 | decompose outside |
| 15 | |||||||
| 39 | Φ4×80m | 16-20 | 0.4-1.5 | 4 | 355 | 564.8 | |
| 30 | |||||||
| 40 | Φ4×80m | 29.17 | 0316-1.582 | 4 | 160 | hollow waste heat | |
| 15 | |||||||
| 41 | Φ4/3.5/4×150m | 30.42 | 0.343-1.714 | 6 | 2×125 | wet double drive | |
| 2×11 | |||||||
| 42 | Φ4×150m | 33.3 | 0.509-1.528 | 6 | 2×125 | wet double drive | |
| 2×11 | |||||||
| 43 | Φ4×150m | 30-34 | 0.402-1.587 | 6 | 280 | wet single drive | |
| 30 | |||||||
| 44 | Φ4.7×72m | 0.35-3.5 | 3 | 550 | decompose outside | ||
| 30 |
Our specialized high-water product workshop
ZK CORP will make proper packing for different machine, which is suitable for sea transport and land transport.
Main part will be in nude. Small parts will be packed in wooden box.
Transport
1. ZK CORP can afford transport directly to destination port or destination place.
2. Customer can arrange both land transport and sea transport by themselves if convenient.
Pre-sale services
Act as a good adviser and assistant of you; enable you to get rich and generous returns on your investments
1. Select equipment model; 2. Design and manufacture products according to clients' special requirement; 3. Train technical personnel for clients
After-sales service
Provide considerate services to minimize your worries.
1. Assist you to prepare for the first construction scheme; 2. Install and debug the equipment; 3. Train the first-line operators on site; 4. Examine the equipment regularly; 5. Take initiative to eliminate the troubles rapidly at site; 6. Distribute the guarantee fittings door-to-door; 7. Provide perfect service; 8. Provide technical exchanging; 9. Provide maintenance for big items.
Now, please click the following contact to send us
↓↓↓




-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
30 days
-
Step 3
Packaging and dispatch
Packaging details are available on request.
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.